5 Reasons The Pre-bid Meeting for the Leh-Kargil 7.5 GW Tender is Critical Updated On Tue, Feb 5th, 2019 by Saurenergy On February 18th this month, interested bidders will be meeting at New Delhi, for answers to their queries and to give their own feedback on SECI’s massive 7.5 GW solar tender for Leh and Kargil in J&K. Here’s why this meeting could provide some clues to the next phase of solar in India. The idea […] Read more
Andhra Pradesh Releases New Wind-Solar Hybrid Policy Updated On Mon, Jan 7th, 2019 by Saurenergy The Government of Andhra Pradesh has set a target to achieve 18,000 MW of renewable energy capacity by the year 2021-22. Keen to harness the huge solar and wind potential of Andhra Pradesh, the state has launched its new ‘Andhra Pradesh Wind-Solar Hybrid Power Policy – 2018’. The Government of Andhra Pradesh has set a […] Read more
Kerala Issues Tender for 200 MW Solar Project Updated On Wed, Dec 26th, 2018 by Saurenergy The project is to be developed on Independent Power Producer (IPP) mode and the deadline for submission of the bid is February 1,2019. The Kerala State Electricity Board (KSEB) has recently issued a tender for the development of 200 MW of grid-connected solar photovoltaic (PV) projects in Kerala. The project is to be developed on […] Read more
TANGEDCO Issues Tender for 500 MW Grid-Connected Solar Project Updated On Wed, Nov 28th, 2018 by Saurenergy The project will be awarded based on a reverse auction to be held on a specified date, the upper ceiling for the bidding is set at Rs 3.00 per unit. Moving towards solar energy, Tamil Nadu Generation and Distribution Corporation Limited (TANGEDCO) has invited bids from solar power generators for the procurement of 500 MW […] Read more
MNRE Issues Draft Scheme on Indian Wind Turbine Certification Updated On Tue, Nov 13th, 2018 by Saurenergy The scheme will not only provide a framework for standards, but also cater to the technical regulations and requirements Consolidating National and International Standards, Ministry of New and Renewable Energy (MNRE) has issued a draft scheme on wind turbines in India. Known as the ‘Indian Wind Turbine Certification Scheme’ (IWTCS), the draft has been prepared […] Read more
MNRE circulates draft Indian Wind Turbine Certification Scheme (IWTCS) Updated On Tue, Nov 13th, 2018 by Saurenergy Ministry of New and Renewable Energy, in consultation with National Institute of Wind Energy Chennai, has prepared a draft of new Scheme called Indian Wind Turbine Certification Scheme (IWTCS) incorporating various guidelinesTurbine Certification Scheme (IWTCS). The IWTCS is a consolidation of relevant National and International Standards (IS/IEC/IEEE), Technical Regulations and requirements issued by Central Electricity […] Read more
ScorpiusTrackers Analysis of 1 Year’s: Generation of 1.1 mwp scorpius tracker plant in karnataka Updated On Thu, Oct 25th, 2018 by Saurenergy SYNOPSIS OF PLANT 1. Canadian Solar Panels 2. ABB PV800 1MW AC Central inverter 3. BLOCK Design of 268.8 KWpx2, 282.24 KWpx2 4. Inter ROW pitch at 5.5 metres, 3.5m clear path between rows for cleaning 5. Loading of 10% on DC 6. Grid downtime of 8.8% across the year 7. PVSyst indicated a generation […] Read more
MSEDCL, Regulator to Consult Wind Power Players for Zone Disputes: Bombay HC Updated On Mon, Sep 24th, 2018 by Saurenergy The high court’s decision came out as a relief for the developers as it affirmed that the authority would make sure that the developers are heard before any decision is made regarding the reclassification of wind power zones. Bombay High Court has directed Maharashtra’s discom Maharashtra State Electricity Distribution Company (MSEDCL) and the state’s electricity […] Read more
A target of installing 175 GW of renewable energy capacity by the year 2022 has been set Updated On Thu, Jul 19th, 2018 by Saurenergy 100 GW of solar capacity by 2022 in the country The Government is promoting development of solar energy in the country by providing various fiscal and promotional incentives The Government has set a target of installing 40 GW of grid connected rooftop solar capacity in the country including Delhi and National Capital Region (NCR) by […] Read more