Nexamp Completes 2.6 MW Community Solar Project in Sutton, MA Updated On Fri, Nov 18th, 2016 by Saurenergy Nexamp has today announced the completion of a 2.6 megawatt Community Solar project located on the Sutton-North bridge town line in southeastern Massachusetts. Consisting of over 8,000 panels, the project is one of the largest Community Solar projects in the Northeast serving local homes, nonprofits and small businesses. The new solar array is built on […] Read more
Geostellar Partners with Progressive National Baptist Convention and Together Solar to Launch Nationwide Community Solar Program Updated On Thu, Nov 17th, 2016 by Saurenergy Geostellar, the nation’s original online solar energy platform, announced today a partnership with the Progressive National Baptist Convention (PNBC), a vital Baptist denomination with an estimated membership of 2.5 million people, and Together Solar, a developer of shared-solar energy generation projects, to offer clean, renewable power through PNBC member churches to their communities and congregations. […] Read more
Georgia Power dedicates new 30-MW solar facility at Fort Gordon Updated On Thu, Nov 17th, 2016 by Saurenergy Leaders from Georgia Power and the U.S. Army joined elected officials, community leaders and other dignitaries at Fort Gordon near Augusta, Ga. dedicated a new 30 megawatt (MW) on-base solar facility. The 30 MW alternating current, or 42 MW direct current, solar generation facility is the third completed by Georgia Power in collaboration with the […] Read more
BHEL Commission 5mw Captive Solar Power Plant Updated On Wed, Nov 16th, 2016 by Saurenergy Bharat Heavy Electricals Limited has commissioned a 5 MW grid interactive solar power plant on its premises in Tiruchirappalli (Trichy). The solar power plant includes an array of 19,968 photovoltaic modules and spread across 25 acres. It also includes power conditioning units, high tension switch gear panels and the SCADA system which are manufactured and […] Read more
BUY or LEASE Your Solar panel system? Updated On Tue, Nov 15th, 2016 by Saurenergy Rooftop solar market in India is speculated to add new capacity of 700 MW in 2016 – 15% of total solar capacity addition this year. According to Bridge to India, the cumulative capacity crossed 1 GW by September and is growing at a sizzling 300% over last year. Ministry of Finance has reduced depreciation rate […] Read more
Why EPC are Treading in the Solar Race? Updated On Tue, Nov 15th, 2016 by Saurenergy Solar has taken the momentum with a cumulative installed grid connected solar power capacity reaching 8,062 MW (8.1 GW) as of 31 July 2016. The ecosystem seems stable as analyst asserts that the solar market in India is set to clan the billion-dollar space. Not much appalling on the WTO setback, Indian Solar manufacturing capabilities […] Read more
Hybrid Solar Wind Market size is expected to reach USD 1.47 billion by 2024 Updated On Mon, Nov 14th, 2016 by Saurenergy Global Market Insights, Inc. in its latest report has revealed that hybrid Solar Wind market size will reach USD 1.47 billion by 2024. The research firm notes that decreasing wind and solar component cost associated with increasing clean fuel energy demand will drive the global hybrid solar wind market size. The component manufacturing cost has […] Read more
Western Railway to install 2 MW solar panels at its suburban stations Updated On Sat, Nov 12th, 2016 by Saurenergy To reduce carbon footprint, the Western Railway will be setting up solar panels at around 30 locations- with a total capacity of 2 MW. The installed solar plant will provide power for its non-traction work. Western Railway expects to reduce dependence on energy from coal-fired plants by around 10% and save lakhs of rupees in […] Read more
1 MW of solar plant at Karnataka’s NIT to get commissioned Updated On Fri, Nov 11th, 2016 by Saurenergy The National Institute of Technology – Karnataka (NIT-K) at Surathkal has emerged the front-runner among 31 NITs in the country to have a roof-top solar-power project with an installed capacity of 1 MW. The 1-MW of solar project on the roof of 11 buildings will be formally commissioned on 12th November 2016. K.N. Lokesh, Director […] Read more