Principal ASIC design engineer Updated On Mon, Aug 7th, 2023 by Saurenergy As a senior member in our Wi-Fi Connectivity MAC design team, the candidate would be responsible for overseeing development of one of our major subsystems. Duties include but not limited to architecture definition, design partitioning, low power optimization, design tradeoff analysis and providing implementation guidance to other team members as well as supporting critical customer […] Read more
1 TW Renewable Potential in Egypt: A Game-Changer or a Distant Dream? Updated On Fri, Aug 4th, 2023 by Saurenergy Egypt has the potential to produce electricity capacity of 350 gigawatts (GW) from wind energy and 650 GW from solar energy, the Minister of Electricity and Renewable Energy Mohamed Shaker suggested at the fourth edition of the round table on the green hydrogen industry in Egypt, chaired by Egypt’s Prime Minister Mostafa Madbouly. The claim […] Read more
Sterling and Wilson Renewable Energy Continues Its Revival With Big Order Wins Updated On Fri, Aug 4th, 2023 by Saurenergy Sterling and Wilson Renewable Energy Limited (SWRE or SWSOLAR) the leading renewable EPC, announced that it has won orders worth INR 826 crore in the first four months of FY 2023-24. The orders aggregate to around 1 GWp and include projects in Rajasthan, Uttar Pradesh and Gujarat. Scope of work for all projects include design, […] Read more
Engineering Assistant (Trainee) & Technician Updated On Thu, Aug 3rd, 2023 by Saurenergy Bharat Electronics Limited, a Navratna Company and India’s premier Professional Electronics Company requires the following personnel for its Pune Unit on permanent basis: 1.0 POSTS:- Sl.No Name of the post Essential Educational Qualification Trade/ Discipline No. of posts Reservati on pattern Grade/ career path/ pay scale (1) (2) (3) (4) (5) (6) (7) […] Read more
RECPDCL Issues RFS for Wind Power Developers for 100 MW Wind Power Projects Updated On Thu, Aug 3rd, 2023 by Saurenergy REC Power Development and Consultancy Limited, a wholly owned subsidiary of REC Limited, a Maharatna company under the Ministry of Power, invites bids for the selection of wind power developer(s) for setting up of 100 MW ISTS-connected wind power project(s) in India via tariff-based competitive bidding (TBCB) process on Build Own Operate (B-O-O) basis unedr […] Read more
Senior / Lead Engineer – Battery Energy Storage System Updated On Tue, Jul 25th, 2023 by Saurenergy Responsibilities:- Review load profiles and Engineer Battery Energy Storage Systems to meet project goals. Clear understanding on the different parameters for design, selection, and sizing of the batteries as well leveraging the parameters to arrive at the most optimum sizes of the batteries. Should have deep understanding on Battery Energy Storage System design, chemistry selection, […] Read more
GSC Terms G20 Energy Transitions Meet In India A ‘Missed Opportunity” Updated On Tue, Jul 25th, 2023 by Saurenergy The Washington DC registered Global Solar Council (GSC), has been left unimpressed by the lack of progress made at Goa, India in the G20 meetings under the Energy Transitions Working Group. Belying hopes of urgent action to deploy the renewable energy capacity needed to stay on a 1.5C pathway GSC claims that the outcomes of […] Read more
NHPC Floats Tender for 200 MW Solar Power Project in 600 GSECL Solar Park Updated On Thu, Jul 20th, 2023 by Saurenergy National Hydroelectric Power Corporation Limited (NHPC) has floated a tender for the establishment of 200 MW solar power project in 600 GSECL (Gujarat State Electricity Corporation Ltd) Solar Park at Khavda, Gujarat. This is for stage-1 of the solar park. The tender comes with e-reverse auction. The bid validity is 120 days from the last […] Read more
SECI Issues Tender for Soil Investigation for 13 GW Renewable Energy Project Sites in Leh Updated On Wed, Jul 19th, 2023 by Saurenergy Solar Energy Corporation of India (SECI) has issued a tender for the appointment of an agency to conduct soil investigation at proposed renewable energy project sites in Leh, Ladakh, with a cumulative capacity of 13 GW. The geotechnical analysis for the project must be completed within eight months of signing the contract. The last date […] Read more