Govt To Electrify 1L Unelectrified Tribal Households With Off-Grid Solar Updated On Fri, Jan 5th, 2024 by Saurenergy The Ministry of New and Renewable Energy (MNRE) is now all set to roll out a dedicated scheme to electrify the unelectrified households of Particularly Vulnerable Tribal Groups (PVTGs) under the Pradhan Mantri Janjati Adivasi Nyaya Maha Abhiyan (PM JANMAN). The MNRE recently issued a notification in this regard. The order said that the ministry […] Read more
In 2024, US-China Trade Tensions Likely To Cast Shadow Over EV, PV Supply Chains Updated On Fri, Jan 5th, 2024 by Saurenergy Short of an unprecedented rapprochement, the EV sector looks set to be headed into some potholes in 2024. The reason is heightening tensions between the US and China, as both countries ratchet up measures to assert control over their respective strengths. For China, it is its huge dominance of the EV supply chain, from batteries […] Read more
First Solar Signs PPA With Cleantech Solar To Procure 150 MW Facility Updated On Thu, Jan 4th, 2024 by Saurenergy First Solar, an American solar technology company entered into a 15-year, captive Power Purchase Agreement (PPA) with Cleantech Solar, a renewable energy solutions provider operating in India and Southeast Asia, the firm said. Under the agreement, Cleantech Solar will construct 150 megawatts (MW) of photovoltaic (PV) solar and 16.8 MW of wind-generating assets in Tamil […] Read more
Plans For Phase-III Of FAME Start, With Bigger, Wider Coverage Updated On Thu, Jan 4th, 2024 by Saurenergy Even as the secoonf phase of the Faster Adoption and Manufacturing of (Hybrid &) Electric Vehicles (FAME) is likely to wind down this year, speculation is rising on the shape of the next phase of the scheme that was brought in to support EV transition. Administered by the Ministry of Heavy Industries (MHI), FAME-I(Rs 895 […] Read more
EKA Mobility And GreenCell Mobility Collaborate To Supply 1000 EV Buses Updated On Wed, Jan 3rd, 2024 by Saurenergy EKA Mobility, one of the electric vehicles and technology company (with Mitsui Co., Ltd. & VDL Groep as equity partners), and GreenCell Mobility, a climate impact investor in electric mass mobility space, signed a Memorandum of Understanding (MoU). Through this collaboration, EKA Mobility will supply GreenCell Mobility with 1000 intercity electric buses in 12-meter and […] Read more
Chandigarh Open Access Consumers May Get Green Power @Rs 6.75/unit Updated On Wed, Jan 3rd, 2024 by Saurenergy The Joint Electricity Regulatory Commission (JERC) for the state of Goa and Union Territories has now come up with a draft discussion paper to compute the green energy open access tariff in Chandigarh. This comes after the Union government issued a notification last year allowing green energy through open access to consumers even with less […] Read more
Senior Engineer – Connectors Updated On Tue, Jan 2nd, 2024 by Saurenergy This role will be responsible for the design activities of Eaton’s electrical connectors, accessories, cables and conduit assemblies within its Aerospace Interconnect Technologies Division. This role supports project engineering in generating the CAD and drawings for new product development and product sustaining activities. Performs design engineering work from concept development, trade studies, design for manufacturability, […] Read more
Self-Certification Scheme For Solar Inverters Extended Till 2024: MNRE Updated On Tue, Jan 2nd, 2024 by Saurenergy The Ministry of New and Renewable Energy (MNRE) in its recent notification allowed an extension on the self- certification for Solar inverters till 2024. The last notification was published in a gazette notification on 28.07.2023. to review the availability of test facilities for limited capacities. “It gave more time for compliance, and implementation of Quality […] Read more
Senior Desing Engineer Updated On Thu, Dec 28th, 2023 by Saurenergy Responsibilities:- Prepare and review of plant & equipment 2D/3D layout, hole & foundation plans, ducting and piping layout, fabrication drawings. Prepare pipe isometric, BOQ, MTO. Prepare man hours estimation of detail design engineering activities. i.e. 3D layout, skids etc. Prepare work planning to compete the given task/project on time and within budget. P&ID review and […] Read more