Sterlite Gets Rs 1373 Cr for 6000 MVA Neemrana Transmission Project Updated On Wed, Jun 5th, 2024 by Saurenergy The Neemrana II Kotputli Transmission Limited (NKTL) project has closed the financing transaction, according to Sterlite Power, a well-known operator in the power transmission industry. The enterprise has achieved a significant milestone with the acquisition of a sizeable sum of INR 1373 crore from Power Finance Corporation (PFC), a prestigious Maharatna Public Sector Enterprise. The […] Read more
Electrical Engineer Updated On Tue, Jun 4th, 2024 by Saurenergy Conceptualize, Design and develop Industrialized Solutions in form of electrical and electronic hardware device, assembly or a system and validate it to formulate all required technical specifications. Works under limited supervision. The Hardware Engineer will perform the role of system architect that involves design and development of electrical and electronic circuits, component selection, sensor selection, […] Read more
Indian Wind Turbine Maker Inox Wind To Go For Fund Raise Updated On Tue, Jun 4th, 2024 by Saurenergy Indian wind energy company Inox Wind Limited (IWL) announced that its Board of Directors, in its recent meeting has approved the raising of funds in the company. With the board’s approval in place and further subject to shareholder and other regulatory approvals, the proceeds from the sale of IWL shares by IWL’s promoter Inox Wind […] Read more
Assistant Lead Service PLM & MDM Engineer Updated On Mon, Jun 3rd, 2024 by Saurenergy Responsibilities:- Accountable for updating and maintenance of MRP data for spare parts and tools Align data management processes in the business’ value chains and process areas Manage and maintain responsibilities to Master Data team, establishing good relationships with business contacts, and making decisions based on results Provide awareness training and key user support on master […] Read more
Assistant Lead Engineer-Cable Design Updated On Mon, Jun 3rd, 2024 by Saurenergy Responsibilities:- Develop and maintain comprehensive design documentation for High Voltage Cables, ensuring accuracy, compliance with industry standards, and effective communication of technical specifications Apply in-depth knowledge and experience in switchgear design to create innovative and efficient solutions Stay abreast of industry trends, standards, and emerging technologies to enhance the design process Coordinate with cross-functional teams […] Read more
Changing Dynamics: Indian Green Firms Shift Focus On Energy Storage Updated On Fri, May 31st, 2024 by Saurenergy In March 2022, India’s leading renewable energy company Adani Green Energy Limited (AGEL) collaborated with another Indian leading player in the energy storage systems–Greenko. The partnership was to seek the Hyderabad-based company’s assistance in getting Round-The-Clock (RTC) power for AGEL’s projects through Greenko’s PSP assets. PSPs are often termed as giant batteries which can storage […] Read more
Mechanical Test Engineer Updated On Thu, May 30th, 2024 by Saurenergy Complete product testing and qualification as per test requirements. Setup the test rig along with fixtures for component qualification. Analyze the test results using the relevant test software. Create and publish the test reports. Designing the test fixtures. Modelling the tracker parts and creating component & assembly drawings. Support engineering teams with fixture design and […] Read more
Design Engineer – Mechanical/Sustainable Engineering Updated On Thu, May 30th, 2024 by Saurenergy The Design Engineer will be based in Hyderabad. In this position, you will report to the Manager – Mechanical Engineering. This position will work on product development, design optimization, prototype generation, creating manufacturing drawings, perform FEA and assist in prototypes in testing facility to meet ensure minimum product standard before product release. Watch this video […] Read more
RWE To Build 1.6 GW Wind Farm Off German North Sea Updated On Wed, May 29th, 2024 by Saurenergy RWE has made the investment decision for its Nordseecluster, involving offshore wind projects with a total capacity of 1.6 gigawatts (GW). The wind farms will be built in the North Sea, about 50 kilometres north of the island of Juist. Suppliers of the main components have already been selected for the cluster as a whole. […] Read more