PM KUSUM: PEDA Issues Bid For Solarizing 75,000 Agricultural Pumps Updated On Fri, Aug 16th, 2024 by Saurenergy The Punjab Renewable Energy Development Agency (PEDA) has issued a tender seeking parties who can install and operate grid-connected solar pumps. Through this tender, the state nodal agency has planned to solarise 75,000 grid connected agricultural pumps through RESCO mode. These bidders will be selected through a tariff-based competitive bidding process through e-reverse auction through […] Read more
Module technical Lead – Electrical Updated On Fri, Aug 16th, 2024 by Saurenergy You will be part of the Module Tech Lead and Integration group, responsible for delivering the complete Low voltage Electrical package, which includes design and development of LV control panels, Cables, Electronics and Sensors used on different applications/sections across the Wind Turbine. You will be deeply involved in the process of Modular Architecture development together […] Read more
SaurEnergy Explains: PEM Vs Alkaline Electrolyser – for Green Hydrogen Updated On Fri, Aug 16th, 2024 by Saurenergy Electrolysers are in the news nowadays, pulled out of industrial obscurity by the new Green Hydrogen rush. So SaurEnergy explains gets down to improving our own, and your understanding of these machines that many hope, powered by renewable energy, will break down water to give us green hydrogen. Electrolysers can range in size from small […] Read more
Project Engineer/Sr. Project Engineering- Electrical Engineering Updated On Wed, Aug 14th, 2024 by Saurenergy To support and act as an active team member of the cross-departmental teams for product development. You should have very high affinity towards the engineering product design and development. You should be very interested and creative to be able to design and develop quality products in lowest possible cost. Roles and responsibilities:- Design and develop […] Read more
Project Leader / Sr. Project Leader – OFA Engineering Energy Conversion Updated On Wed, Aug 14th, 2024 by Saurenergy To support and act as an active team member of the cross departmental teams for product development. You should have very high affinity towards the engineering design and product development. You should be very interested and creative to be able to design and develop quality products in lowest possible cost. Roles and Responsibilities:- Lead and […] Read more
Senior Engineer-Operations & Maintenance Updated On Mon, Aug 12th, 2024 by Saurenergy Responsibilities:- Understand how a process plant operates using the provided source information, such as PFDs, P&IDs, control/operating philosophies, C&Es, datasheets, package supplier IOMs and derive the information required by clients for the safe operation of the facility, system or equipment. Develop operating manuals and procedures adhering to agreed standards and templates. This will include procedures […] Read more
India’s Renewable Capacity Surpasses 150 GW: MNRE Updated On Mon, Aug 12th, 2024 by Saurenergy India’s total renewable energy capacity (excluding large hydro) has now touched 150 Gigawatt (GW), latest data from the Ministry of New and Renewable Energy (MNRE) reveals. The latest data from the ministry for the month of July shows that India added a total of 1733.66 MW of new solar capacities. During the same period, India […] Read more
Every Indian District Soon To Host One Model Solar Village Updated On Mon, Aug 12th, 2024 by Saurenergy Every district of the country is now all set to host one model solar village. The Ministry of New and Renewable Energy (MNRE) has now come out with detailed guidelines to make this a reality. As per the norms, these model solar villages will be developed as components of the PM Surya Ghar scheme with […] Read more
Envision bags 116 MW Wind Turbine Deal From Blueleaf Energy Updated On Mon, Aug 12th, 2024 by Saurenergy Envision Wind Power Technologies India Private Limited has announced a major milestone by securing a 116 MW turbine supply agreement with Blueleaf Energy. This agreement involves the supply of 35 EN-156 3.3 MW turbines for a co-located wind-solar hybrid power project in Madhya Pradesh, set to commence construction in 2024 and complete by 2025. […] Read more