Gujarat Plans To Add 40MW By Solarising Govt Buildings Updated On Thu, Sep 26th, 2024 by Saurenergy The Gujarat Energy Development Agency (GEDA) has now planned to add 40 MW of new solar capacities by solarising its government buildings. In its one of the recent tenders, GEDA sought bidders who can form a Joint Venture with the government to install rooftop solar on government buildings. As per the mandate, the state nodal […] Read more
4-Year Project Delay Proves Expensive For Rajasthan Solar Developer Updated On Thu, Sep 26th, 2024 by Saurenergy The Appellate Tribunal For Electricity (APTEL) bench has gone with the views of the Rajasthan Electricity Regulatory Commission (RERC) in a case (appeal no 172 of 2019) involving a solar power developer, Arjun Green Power Pvt Limited against the order of the former. Case Overview: Arjun Green Power Pvt. Ltd., a solar power developer, appealed […] Read more
Envision, TÜV Nord Sign Pact To Boost Large Wind Turbines Updated On Thu, Sep 26th, 2024 by Saurenergy Chinese wind turbine maker Envision Energy and TÜV Nord has now signed an agreement to boost the deployment of large scale wind turbines. At WindEnergy Hamburg, Envision Energy’s Senior Vice President and President of the Wind Turbine Division, Yimin Lou, and TÜV Nord’s Global Executive Vice President of Renewable Energy, Alexander Ohff, signed a strategic […] Read more
EDU Manager Traction and Energy SEC Updated On Wed, Sep 25th, 2024 by Saurenergy A Project System Engineer specifies, for a project, one or several System Architecture Areas (SAA) and/or associated sub-system(s) at train level and lead technically the engineering studies to design solutions related to his SAAs which meet the project system requirements allocated to them at train level. He is in charge of performing subsystem/component development activities […] Read more
Senior Performance Analyst Updated On Wed, Sep 25th, 2024 by Saurenergy The principle responsibilities essentially includes:- Responsible for conducting performance analysis of solar PV plants in operation which would essentially include Analysis and development of meteorological files for use in simulation software. Analysis of energy production data from PV projects, including comparison of operating vs. modelled data, downtime analyses. Statistical Analysis of Long Term Energy Yields […] Read more
Trinasolar Unveils 645W Recyclable Module With 20.7% Efficiency Updated On Wed, Sep 25th, 2024 by Saurenergy Trinasolar recently produced a fully recycled c-Si module. The recycled PV module uses n-type TOPCon technology and has a golden-size design, with a module efficiency of 20.7% and power output exceeding 645W. The research center academy of Trinasolar developed the recycled module with its self-developed recycling technology, using materials, including silicon, silver, aluminum frames, and […] Read more
Team Leader – NC programming – Smart Manufacturing Solutions Updated On Mon, Sep 23rd, 2024 by Saurenergy We are looking for a dynamic Leader who can deliver the quality and timely output by using Automations into the tools and manufacturing processes. You should be also contribute in the Competence Development activities. As Team leader – Tool design, your mission is to use latest technological solutions to increase the productivity, reduce cost. You shall achieve this, […] Read more
Technical Support Specialist (Remote) – Renewables / Sustainability Updated On Mon, Sep 23rd, 2024 by Saurenergy Configuration and Troubleshooting:- Investigate and troubleshoot system and configuration issues raised by customers or impacting customers. Provide assistance to existing customers at critical times of the year. May support multiple products and technology. Advise and assist customers in maintaining their use and configuration of the software solution(s). Configure the system as per defined requirements using […] Read more
Kerala Plans To Use BESS At Trivandrum Hospital On Pilot Basis Updated On Mon, Sep 23rd, 2024 by Saurenergy The Kerala government has decided to use solar power and battery energy storage systems in a pilot project. As per the plan, the Agency for New and Renewable Energy Research & Technology (ANERT) will execute the project in a Trivandrum Hospital. This pilot project will be executed under the Smart City Programme for Thiruvananthapuram. The […] Read more