PV Design Engineer Updated On Sat, Jul 17th, 2021 by Saurenergy We are seeking a detail-oriented, experienced, and organized Design Engineer to join our growing team. In this position, he/she will research and develop new ideas and prototypes to create and build for our company. You will create plans and blueprints, collaborate with key suppliers, and oversee the manufacturing of prototypes and final building. You will […] Read more
CAD Engineer Updated On Fri, Jul 16th, 2021 by Saurenergy Prepares detailed isometrics, layouts, general arrangements, P&ID and related CAD data for assignments related to oil and gas plants as part of integrity engineering under little supervision. Responsibilities:- Essential:- Prepare Process Flow Diagrams and P&IDs. Create as-built and isometric drawings for piping and structural components. Proficient in drafting symbols used in PFDs, P&IDs, SLDs, BLDs […] Read more
Field Technician OTH Updated On Thu, Jul 15th, 2021 by Saurenergy Perform preventive maintenance on wind turbines: check bolt torques, lubricate moving parts, replace air and oil filters, perform cleaning, check oil level and coolant level, calibrate inductive turbine sensors. Perform corrective maintenance of wind turbines: replace electronic boards, electric motors, reducers, inductive sensors, temperature sensors, capacitors, diodes, sources, couplings, encoders, adjust inductive sensors, calibrate pitch […] Read more
Lead Operability Engineer Updated On Thu, Jul 15th, 2021 by Saurenergy The role of the Lead Operability engineer includes driving control tuning optimization for reliable, high performance and low LCOE wind turbines products and supporting segment simulation teams by providing control tuning guidance. Roles and Responsibilities:- Lead Control tuning and optimization strategy for new and existing products. Drive control tuning for AEP vs Loads trade-off optimization, […] Read more
AfDB Grants $6 M to Initiate ‘Desert to Power’ Program in Africa Updated On Thu, Jul 15th, 2021 by Saurenergy ‘Desert to Power West Africa Regional Energy Program’, an initiative led by the African Development Bank Group (AfDB), will be injected with a $6 million grant to launch its initial phase, as per the bank’s board of directors’ recent approval. Desert to Power, an initiative led by the Bank, is expected to transform the Sahel by […] Read more
Agm/Dgm– Maintenance Updated On Thu, Jul 15th, 2021 by Saurenergy To lead all Maintenance activities for module manufacturing at ReNew with a focus on cost reduction and optimization utilization of Machines. Responsibilities:- Managing the entire module machines, equipment’s, utilities and project maintenance of entire high volume module manufacturing lines for running the operations 24*7*365 days. Leading a large size team of technical resources including engineers […] Read more
Global Solar Lighting Systems Market to Reach $11.2 Billion by 2026 Updated On Wed, Jul 14th, 2021 by Saurenergy A research report published by Global Industry Analysts Inc., (GIA) makes the prediction that the global solar lighting market will reach $11.2 billion by 2026. The global market for Solar Lighting Systems is estimated at US $ 5.5 Billion in the year 2020. Thus, the revised size of US$11.2 Billion by 2026 will entail growing […] Read more
Assistant Manager/ Deputy Manager- Electronics (Application) Updated On Wed, Jul 14th, 2021 by Saurenergy Sizing and selection of servo and hydraulics components Programming and commissioning of Servo solutions for Plastics, Press, Printing , Metallurgy Programming and commissioning for general automation applications Commissioning of hydraulics valves , Hydraulic motion controllers with complete systems AutoCAD Drawing preparation Technical discussion with customer Qualifications And Experiences:- B.E./ B. Tech in Electronics/ Instrumentation/ Mechatronics […] Read more
5MW Second Phase Solar Plant Commissioned by GMR Hyderabad Airport Updated On Tue, Jul 13th, 2021 by Saurenergy GMR Hyderabad International Airport Ltd (GHIAL) said yesterday that it has commissioned the 5 MW second phase of its solar power plant, taking its total solar power capacity to 10MW. The solar plant, set up for captive consumption, is spread over an area of 45 acres and comprises over 30 thousand solar panels that have […] Read more