Associate Engineer-Electronic Component Cost out Updated On Mon, Dec 23rd, 2024 by Saurenergy The primary responsibility of this role is to study, analyze the spend data finding out gaps for cost out, create strategies for cost-out project execution for electronics category. Understands the requirements for all electronics components, Printed Circuit Boards and assembly to meet customer specific technical requirements. Creating cost out (VA) project and execution strategies in […] Read more
PM KUSUM: Rajasthan DISCOM Invites Participation Under Component C Updated On Mon, Nov 4th, 2024 by Saurenergy Rajasthan DISCOM Jaipur Vidyut Vitran Nigam Limited (JJVNL), in its latest tender, seeks to implement feeder-level solarization under Component C of PMKUSUM. This component involves ground-mounted solar installations, where land cost is the second most significant expense after solar PV panel costs in the total project budget. The last date for bids submission till 2nd […] Read more
Shakti Pumps Bags First Solar Pump Order Under PM-KUSUM’s Component C Updated On Mon, Oct 9th, 2023 by Saurenergy Shakti Pumps, one of the largest Indian solar pumping companies and a prominent player in the renewable energy sector, has announced the receipt of its inaugural commercial order under the PM-KUSUM scheme Component-C from Ajmer Vidyut Vitran Nigam Limited for the total worth of INR 149.71 Crs. The win is a significant milestone as the […] Read more
PGVCL Invites Proposal for 921 MW Solar Projects Under PM-KUSUM Component C Updated On Wed, Mar 1st, 2023 by Saurenergy Paschim Gujarat Vij Company (PGVCL) has invited proposals for the development of 921 MW of solar projects under Component C of the Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan (PM-KUSUM) program. The last date for submitting online bids is March 17, 2023 The scope of work in the project involves- Converting 11 kV feeders […] Read more
TPCDOL Invites 180 MW Grid-connected Solar Pumps Under KUSUM Yojna – Component C Updated On Thu, Oct 13th, 2022 by Saurenergy A joint venture between Tata Power and Odisha Government, TP Central Odisha Distribution (TPCODL) has floated a 180 MW of tender for 40,000 grid-connected solar pumps under component-C of the Pradhan Mantri Kisan Urja Suraksha Evam Utthaan Mahabhiyan (PM-KUSUM) Yojna. These grid-connected submersible pumps will be under 1, 2, 3, 5, and 7.5 horsepower (HP). […] Read more
RERC approves levelised tarrif of Rs 2.89 For Kusum Component C Project Updated On Wed, Mar 9th, 2022 by Saurenergy The Rajasthan Electricity Regulatory Commission (RERC) recently ruled in favour of Jaipur Vidyut Vitran Nigam Ltd. (JVVNL), which had requested the commission to approve the levelized tariff discovered through competitive bidding for a 4.24 MW pilot solar power project for feeder level solarization under Component-C of the PM-KUSUM scheme. The Ministry of New and Renewable Energy […] Read more
Technician – Component Engineering Updated On Mon, Jan 27th, 2025 by Saurenergy Responsible to support different design/Manufacturing site for Product, Part, drawing and other design related process. Maintenance of various business-related documents including datasheets, functional processes, policies, engineering drawings, engineering changes, project reports, specifications, product proposals and product / Part documentation Enter and maintain component data and manufacturer information & approved vendor lists in global component database. […] Read more
Battery Components Engineering : Cold plate Updated On Mon, Jan 27th, 2025 by Saurenergy Responsibilities:- Thermal Component Ownership: Act as the Thermal Component Owner (Design Release Engineer) for cold plates and plumbing within battery energy storage systems. Cold Plate Design: Design and develop efficient cold plates for thermal management, ensuring optimal heat dissipation and performance. Plumbing Systems: Engineer and integrate effective plumbing systems for coolant flow within thermal management […] Read more
Battery Systems: Thermal Component Owner (DRE) Updated On Mon, Jan 27th, 2025 by Saurenergy Responsibilities:- Thermal Interface Material (TIM): Design, select, and optimize Thermal Interface Materials to ensure efficient heat transfer and thermal management within battery systems. Aerogel: Develop and integrate aerogel-based solutions for superior thermal insulation and management in energy storage applications. Mica Sheets: Utilize mica sheets for thermal and electrical insulation, ensuring compliance with safety and performance […] Read more