SUBSCRIBE NEWS LETTER

component a

MNRE invites comments on Technical Regulation for Solar Photovoltaic Systems/ Devices/Components Goods

Performance testing and standardization is essential to ensure quality and reliability of products.  As per norms of Department of Commerce, Ministry of Commerce and Industry, standardization of all goods and adopting technical regulation is mandatory to maintain quality to protect human health and safety.  This also prevents entering of poor quality goods into the Indian […]

Read more

Advanced Procurement Engineering Specialist

Perform Long-Lead-Time (LLT) analysis of the Bill-of-Material (BOM), early in the Design-Phase of New Product Development. Identify and manage Single-Source and Sole-Source Components in the BOM under development. Create and maintain approved component and vendor lists in collaboration with Category Managers and Product Engineering. Perform Risk-Buy analysis for components to avoid delays in Product Launch. […]

Read more

Govt Proposes Mandating RE for Open Access, Captive Users

The Indian government has recently amended the renewable Energy Consumption Obligation (RCO) rules to facilitate open access consumers and captive power users, ensuring a smoother regulatory framework for renewable energy obligations. The Ministry of Power (MoP) issued a notification detailing these changes, aiming to enhance compliance with renewable energy consumption mandates. The government has sought […]

Read more

Insolation Gets 38.43 MW Solar Projects in Rajasthan for ₹134 Cr

Jaipur-based Insolation Energy has recently secured a Letter of Intent (LOI) to develop multiple solar projects in its home state of Rajasthan. The company shared the details about the project in a regulatory filing, which stated, “From these three LOIs, Insolation Energy will develop a combined solar power capacity of 38.43 MW. The final levelized […]

Read more

OREDA Issues Tender, Seeking EPC Contractors For PM-KUSUM

Odisha Renewable Energy Development Agency (OREDA) has issued a tender seeking EPC contractors to take up solarisation works under PM-KUSUM scheme. As per the mandate, the state nodal agency is seeking companies who can take up the works under the Component-A of the central government scheme. The OREDA tender said that the contractors need to […]

Read more

Gas Turbine R&D – Product Definition Engineer

Understand the product structure, design requirements and design principles Design and detailing of Gas Turbine components. Create new product designs and product assemblies Documentation Work with project lead to understand the requirements, provide engineering data, timelines and deliver related design activities within agreed timeline Qualification and Experience:- B E / B Tech in Mechanical engineering […]

Read more

Project Engineer – Project Manager Certification (Wind Turbine)

Independently determines project scope, develops a preliminary plan of investigation, and determines project specifications such as cost, time, and sample requirements by analyzing client input, available supplemental data, and product construction. Initiates communication with clients to promote and explain the benefits of new and existing services. Follows up on contacts from clients. Communicates with clients […]

Read more

PM-KUSUM (Comp A): Centre Allocates 5 GW Capacity To Rajasthan

The Ministry of New and Renewable Energy (MNRE) has now ordered allocating an additional 5,000 MW capacity to Rajasthan under the PM Kusum (Component A) Scheme. Union Minister for New and Renewable Energy Prahlad Joshi allocated the additional quota to the state after receiving a representation from Rajasthan Chief Minister Bhajan Lal Sharma and a […]

Read more

Asst. Manager/Manager – SCM

Technical skills:- Very Strong knowledge of Procurement of HT / LT Motor, Instrument Panels, Other Electrical Component and Control & Instrumentation components. Should be able to do the detailed Costing of Electrical Components and should do the rate negotiation effectively. Candidates having experience in Thermal Power Plan Equipment / EPC Projects will be preferred. New […]

Read more
      SUBSCRIBE NEWS LETTER
Scroll