SJVN To Build 105-MW Floating Solar Project In Maharashtra Updated On Fri, Oct 21st, 2022 by Saurenergy State owned renewable energy multinational Satluj Jal Vidyut Nigam (SJVN) has announced that the company has won the 105-MW floating solar project from the Maharashtra State Power Generation Company (MAHAGENCO). SJVN said that it obtained the project through an e-reverse auction. SJVN mentioned in the announcement that it bagged the 105-MW Floating Solar Project at […] Read more
Predictably, Government Shuts Loophole For Concessional Import Of Solar Modules Updated On Fri, Oct 21st, 2022 by Saurenergy In a move that many felt was widely anticipated, but where the delay on acting had given rise to hopes too, the government has finally moved to shut down the option of importing solar modules using a provision in the Project Import Regulations, 1986 that allowed complete power plants to be imported at concessional rates. […] Read more
Engineer – Busbars & Connectors (EV) Updated On Thu, Oct 20th, 2022 by Saurenergy Execute Engineering Design & Development projects for busbars, interconnecting connectors for EV battery packs. Generate ideas & convert the concepts in to manufacturable product designs. Execute assigned concept development, engineering calcualtions and analysis, apply DFSS tools to ensure a data driven, robust engineering practice. Create & review drawings & CAD 3D models, follow change management […] Read more
Engineer – Structural Dynamics Updated On Thu, Oct 20th, 2022 by Saurenergy If you desire to be part of something special, to be part of a winning team, to be part of a fun team – winning is fun. We are looking forward to Engineer – Structural Dynamics in Pune, India. In Eaton, making our work exciting, engaging, meaningful; ensuring safety, health, wellness; and being a model of inclusion & […] Read more
Assistant Lead Engineer – Design Updated On Thu, Oct 20th, 2022 by Saurenergy Responsibilities:- Identification and requirements specification for the Tower Internals Building Blocks Design new solutions from early conceptualization to final detail design Optimization of the solutions through FEA assessment and structural calculation Verification of the new solutions performing Fit, Form and Function tests in our wind Turbine Tower prototypes Coordinate suppliers and co-develop new Building Blocks […] Read more
Asst. Lead / Lead Engineer – Quality Updated On Thu, Oct 20th, 2022 by Saurenergy Responsibilities:- Your primary responsibility will be to develop solutions for quality issues in collaboration with our stakeholders in the Tower value chain Participate in forensic engineering analysis to determine technical and systemic root causes of reported field issues Develop technical solutions as part of Vestas Continuous Improvement Management Ensure Closed Loop Quality by capturing lessons […] Read more
Service Development Engineer VTS Updated On Thu, Oct 20th, 2022 by Saurenergy As Service Development Engineer for VTS you will be responsible for the delivery of world class Service solutions into the Global Service Technology Centre’s & Field Service organization to stimulate VTS sustainable and profitable growth. You will primarily focus on new product introduction (NPI) and Design for Service. You will work closely with the team […] Read more
Senior Design Engineer(NPD_VTBA) Updated On Thu, Oct 20th, 2022 by Saurenergy Project Design:- Understand the scope of work for New Product Development. Taking lead in planning and estimating the work. Conduct feasibility study and design the manufacturing and engineering drawings as per requirements. Solving technical queries of subordinates and working as a Design Expert. Conducting design reviews of 3D models and 2D drawings. Design of Industrial […] Read more
FIMER Solar Inverter Solutions Support Yarmouk University with 3.59 MW Capacity Updated On Thu, Oct 20th, 2022 by Saurenergy A recent supply of solar inverters from Italian company FIMER included 14 TRIO-20.0/27.6-TL and 48 PVS-50/60-TL for Yarmouk University’s solar plants. (FIMER Solar Inverter) This unique project, known as the Yarmouk University Project-Phase 2, was erected in 2021 and has a 3.6 MWP capacity powered by 48 FIMER PVS-50/60-TL and 14 TRIO-20.0/27.6-TL, which allows 350 […] Read more