SolarEdge To Rollout Energy Optimisation Software Platform Updated On Wed, Jun 19th, 2024 by Saurenergy Provider of smart energy technology, SolarEdge Technologies, Inc., announced the global launch of SolarEdge ONE for C&I, a complete software-based energy optimization platform for commercial and industrial (C&I) solar applications. It is anticipated that this platform will be widely accessible in the upcoming months. The company’s energy optimization platform, SolarEdge ONE for C&I, was created […] Read more
Zetwerk Owned Unimacts Opens Second US Plant For Nextracker Updated On Wed, Jun 19th, 2024 by Saurenergy Unimacts, a manufacturing services company that was acquired by Indian contract manufacturing startup Zetwerk in 2022, has expanded its relationship with leading US solar tracker maker Nextracker. Unimacts has opened up its second manufacturing facility in Sloan, Nevada for Nextracker to make steel torque tubes, a key component of Nextracker’s solar trackers. This new facility […] Read more
Assistant Manager- PMO Updated On Tue, Jun 18th, 2024 by Saurenergy The role will be a part of the Project Monitoring team with the primary responsibility of ensuring project success by supporting PMO Leader and Project Manager across all stages of capital projects which will be primarily Solar, Wind and Hybrid Projects. Responsibilities:- Prepare integrated project plans on MS Projects/ Primavera across different projects by defining […] Read more
Shift Engineer – Solar – Production Updated On Tue, Jun 18th, 2024 by Saurenergy Ensuring day wise production as per day wise plan of RBD,Stranding and Armouring. Identify and resolving atleast one safety issue in each areas of Wire Drawing,Stranding,Armouring in every month. Ensuring the Uptime(run time) of the section of Wire Drawing,Stranding and Armouring Section to be more than 80% i.e OR more than 80%. Position Summary:- Ensure […] Read more
Green Stocks June 18: Shakti Pumps Sees Highest Surge In Stock Price Updated On Tue, Jun 18th, 2024 by Saurenergy The green energy stock market today remained mostly stagnant with no major price fluctuations. However, Indore-based solar pump company Shakti Pumps remained the leader among all the green energy companies in terms of their stock prices. Shakti Pumps reported a 5 percent rise in its stock prices. The second highest surge in stock price was […] Read more
Honeywell Forays Into AI Battery Manufacturing Platform Updated On Tue, Jun 18th, 2024 by Saurenergy Honeywell has announced the launch of its Battery Manufacturing Excellence Platform (Battery MXP), an artificial intelligence (AI)-powered software solution designed to optimise the operation of gigafactories from day one by improving battery cell yields and expediting facility startups for manufacturers. With traditional standalone solutions, battery manufacturers’ material scrap rates can be as high as 30% […] Read more
Waaree Energies Founder Hitesh Doshi Recognized as Global Solar Leader at SNEC 2024 Updated On Tue, Jun 18th, 2024 by Saurenergy Mr. Hitesh Doshi, whose name has been synonymous not only with the firm he founded, but also the Indian solar sector, has been awarded the Global Solar Leaders Award (2024) for his outstanding contributions to solar industrial progress worldwide at SNEC 2024. The PV SNEC is the World’s largest solar expo by a distance, held […] Read more
Manager-Sales & Marketing Updated On Tue, Jun 18th, 2024 by Saurenergy Key Responsibilities:- Enquiry Generation / Business development for Retrofit and brownfield MEP projects. HVAC/ Electrical / Fire Fighting System knowledge in general and strong in-depth knowledge on HVAC design & engineering. Conducting inspection and site visit for studying the existing system and site requirement. Ready to travel across target territories assigned. Computer literate, knowledge of MS […] Read more
GB Solar Starts Work On Expanding Module Capacity to 2 GW Updated On Tue, Jun 18th, 2024 by Saurenergy Vadodara, Gujarat based PV manufacturer GB SOLAR TECHNOLOGIES PVT LTD ( formerly GreenBrilliance Renewable Energy LLP), is expanding its PV module production capacity to 2.0 GW. The capacity, located in Karjan, Vadodara, will start production within 6-8 months this year. A ground-breaking ceremony was held on 7th June, 2024 at the site in the village […] Read more