Solar Power Tariff Expected to Get Cheaper than Coal Updated On Mon, Apr 24th, 2017 by Saurenergy The solar power tariff has seen a significant decline in tariffs from Rs. 10.95-12.76/kWh in 2010-11 to as low as Rs. 3.15 per kWh, which is expected to fall to Rs. 2.90 per unit. India’s solar power prices may be set to fall below those of thermal (coal) energy. This is based on an expected […] Read more
Ingot Carving the Future Updated On Mon, Apr 24th, 2017 by Saurenergy Silicon is the most abundant solid element on earth; it makes up more than 25% of the earth’s crust. However, it rarely occurs in elemental form, virtually all of it is existing as compounds. Solar cells are made from silicon boules, polycrystalline structures that have the atomic structure of a single crystal. The most commonly […] Read more
DSM introduces high performance Anti-Soiling coating for solar cover glass. Updated On Thu, Apr 20th, 2017 by Saurenergy DSM’s Anti-Soiling coating brings direct performance improvements and indirect maintenance savings, boosting the Internal Rate of Return (IRR) of PV solar projects. DSM has unveiled its new Anti-Soiling (AS) coating for Photovoltaic (PV) solar glass. The new coating provides a unique combination of anti-soiling and anti-reflective properties, and is aimed specifically at PV modules […] Read more
Utility Scale O&M Practices Updated On Thu, Apr 20th, 2017 by Saurenergy India has been moving ahead aggressively with an ambitious programme to reach an installed capacity of 100GW solar power by 2022. Many states are setting up Multi-megawatt solar power installations to herald the arrival of the renewable energy generation. Solar Power Plants are built to last 25 years or more. However, after the Engineering Procurement […] Read more
Solar Junction Box “The Black Wizard Bihind Panels” Updated On Wed, Apr 19th, 2017 by Saurenergy With the rise of the solar industry during the past decade, demand for PV systems and their components has increased drastically. Best termed as the Balance of System (BoS), these solar system components are becoming significant and integrated part of the PV industry. The technological advancement in making of each component and constant innovative approach […] Read more
Secondary Solar Market in India Updated On Tue, Apr 18th, 2017 by Saurenergy with the rise of the solar market, there has been a constant pressure on Indian developers to churn their capital. To minimize the pressure the developers are laying the foundation for the advent of the secondary market for solar assets by shopping their rapidly growing solar projects to prospective investors. The merger and acquisition (M&A) […] Read more
UBM India Commences Second edition of RenewX in Hyderabad Updated On Mon, Apr 17th, 2017 by Saurenergy launched the second edition of RenewX was held in Hyderabad on April 7-8, witnessing a congregation of South India’s green economy community. UBM India, organizers of Renewable Energy India ( REI ) Expo launched the second edition of RenewX, a two day expo (April 7-8 ) at Hitex, Hyderabad. The expo witnessed a congregation of […] Read more
VIZ-A-VIZ with Alex Au, CTO, NEXTracker Updated On Sat, Apr 15th, 2017 by Saurenergy “While India tenders for storage + PV projects are beginning to take root after a year or so of fits and starts, NEXTracker has been building a solid foundation of brain power and boots on the ground staff in our Hyderabad office from design engineers, product and project managers. We look forward to enhancing India’s […] Read more
VIZ-A-VIZ with Shyam M. Gupta, Project Manager – Saurya EnerTech Updated On Sat, Apr 15th, 2017 by Saurenergy “Outsourcing of manpower and other sources might prove costly in case of O&M so it may be good option to take local help for this work. In some cases, if the O&M cost is going high by influences of local unions/demand wages. These all issues may be sorted out in local Gram Panchayats/Local courts by […] Read more