SEIA Envisions To Install 700 GWh ESS Across US By 2030 Updated On Thu, Jan 30th, 2025 by Saurenergy US solar body Solar Energy Industries Association (SEIA) has unveiled a target for the U.S. to deploy 10 million distributed storage installations and reach 700 gigawatt-hours (GWh). These targets are part of a new whitepaper that analyzes the economic and energy security imperative of the storage sector. SEIA has also set sub-targets for residential, community, […] Read more
Maharashtra: Blue Energy To Set up 30,000 E-Truck Manufacturing Plant Updated On Wed, Jan 22nd, 2025 by Saurenergy Blue Energy Motors has signed a Memorandum of Understanding (MoU) with the Maharashtra government at the World Economic Forum in Davos. The MoU paves the way for Blue Energy Motors Ltd.’s proposed investment in the state, with plans to manufacture 30,000 electric trucks to foster industrial growth and significantly enhance the region’s EV truck manufacturing […] Read more
Exicom Optimistic For Its Integrated BESS & Charger Unit Updated On Mon, Jan 20th, 2025 by Saurenergy Exicom, a leading Electric Vehicle (EV) charging and critical power solutions company, is optimistic about its integrated Battery Energy Storage System (BESS) and charging pump offering. The company recently showcased its new integrated system design at the Bharat Mobility Expo. Top management told Saur Energy that the unit can seamlessly connect with both off-grid solar […] Read more
Lubi Industries bags BPCL Order for 1400 Fast DC EV Chargers Updated On Thu, Jan 16th, 2025 by Saurenergy In one of the larger orders for DC fast chargers , Ahmedabad based Lubi Industries has been awarded a major contract by Bharat Petroleum Corporation Limited (BPCL) to manufacture, supply, install, and commission 1,400 fast DC EV chargers across the country. The order when executed will be one of the largest DC Fast Charging networks […] Read more
Gridlock Ahead? Transformer Shortage and the Renewable Energy Challenge Updated On Thu, Jan 9th, 2025 by Saurenergy Transformers play a vital role in energy distribution systems by converting high-voltage electricity from transmission lines into low-voltage electricity for consumer use. Thus any supply disruptions in the supply of this essential component, coupled with resultant rising prices in the global transformer market, can significantly affecting utilities. Over the past three years, this situation has […] Read more
Govt Brings Draft Rule To Lower Tariffs For EV Users Updated On Wed, Jan 8th, 2025 by Saurenergy The latest draft rule made by the Ministry of Heavy Industry (MHI) has proposed new benefits under the PM-Drive scheme. The PM Electric Drive Revolution in Innovative Vehicle Enhancement (PM E-DRIVE) Scheme aims to boost electric mobility in the country with a special focus on electric buses and other electric vehicle segments. Currently, the EV […] Read more
Andhra Pradesh EV Policy Boosts Private Investment In EV Manufacturing Updated On Thu, Dec 12th, 2024 by Saurenergy To transform Andhra Pradesh into an electric vehicle (EV) manufacturing hub, the state recently announced its Andhra Pradesh Sustainable Electric Mobility Policy (2024-29). This policy will be in effect for the next five years, promoting quality infrastructure through private investments, fostering urban mobility growth, and reducing transport-sector emissions to achieve carbon neutrality by 2047. The […] Read more
Bengaluru Needs 36000 Public Charger Guns To Meet EV Demand In 2030: CSTEP Updated On Tue, Nov 19th, 2024 by Saurenergy Bengaluru will require more than 36,000 public charger guns—25 times the guns it had in 2023 to meet its 2030 charging needs, a latest recent report by the Center for Study of Science, Technology and Policy (CSTEP) said. A charger gun, also known as an EV charging cable or connector, is a device that connects […] Read more
Gujarat Set To Build Its First Long Duration BESS Updated On Mon, Oct 21st, 2024 by Saurenergy Gujarat Urja Vikas Nigam Ltd (GUVNL), the state electricity regulatory body, has taken the first step to transition from a battery energy storage project to developing its first Long Duration Energy Storage System (LDES) in Gujarat. It has released a draft tender to select developers for an 800 MW (200 MW x 8 Hrs) battery […] Read more