Deputy Manager – Electrical Design Engineering Updated On Thu, May 12th, 2022 by Saurenergy Technical:- Design of LV panel boards/switchboards Design of basic control/ relay schemes Proficiency in AutoCAD & MS office Ability to interact with field sales force and plant manufacturing personnel Good expertise in Electrical Transmission and Distribution LT Designing Analyzing customer requirements, generating system level configurations and executing design solutions Develop bill of material and wiring diagrams per customer supplied diagrams, one-lines, and specifications. Ability to use and interpret company and industry codes and standards (ANSI, UL, NEMA, […] Read more
Supervisor- Maintenance Updated On Wed, May 11th, 2022 by Saurenergy Manage a team of technical staff in the shift. Plans and supervises the scheduling of daily work assignments of all shift technicians. Responsible for training and developing direct reports and setting objectives. Provides direction to shift technicians, contractors and vendors to ensure that First Solar’s standards are met. Conduct shiftly Passdown and ensure all technicians adhere […] Read more
US probe into solar imports threatens almost 2/3 of planned capacity additions in 2022: Rystad Energy Updated On Wed, May 11th, 2022 by Saurenergy As much as 17.5 gigawatts (GWac) of planned US solar capacity installations in 2022 are in doubt after the Department of Commerce (DOC) opened an investigation into panel imports from southeast Asia, Norway-based Rystad Energy research shows. The US was expected to install 27 GWac of solar energy capacity in the utility, residential, and commercial […] Read more
Promise To Reality- 5 Battery Breakthroughs That Could Make It To Market Soon Updated On Wed, May 11th, 2022 by Saurenergy Innovation is inevitable. As any technology evolves, so do the expectations with it. Similarly, the battery technology has also been evolving, throughout history, in the desire to make it more efficient, powerful, dependable, sustainable, and whatnot. The lithium-ion batteries-saga itself is as old as 1970s, and is still improvising. However, a big complaint from industry […] Read more
Borosil Renewables Plans To Become Largest Non Chinese Solar Glass Manufacturer Updated On Tue, May 10th, 2022 by Saurenergy Solar panel glass manufacturer Borosil Renewables has announced that it will invest Rs 1,500 crore over the next two years to expand its capacity by nearly 2.5 times and supply glass for 15 GW of solar modules by FY25. As of March 2022, India has around 15 GW of solar module manufacturing capacity. Due to stiff […] Read more
Bhago Mobility Solutions Acquires Stake In Pastiche Energy Solutions Updated On Tue, May 10th, 2022 by Saurenergy Bhago Mobility Solutions Private Limited (Bhago), the Green Energy Vertical for Modern Automotive Limited (MAL), has announced an equity acquisition in Pastiche Energy Solutions (P) Ltd (Pastiche), one of the oldest players in the Energy Storage Sector in India, since 2015. The partnership will aggregate the strengths of both the companies towards the manufacturing of […] Read more
Growatt Wins 22 “EuPD Researcher Top Brand” awards Updated On Mon, May 9th, 2022 by Saurenergy Leading inverter brand Growatt has won 22 “EuPD Top Brand” Awards, covering a total of 20 countries and regions. The countries include Americas, Europe, Asia Pacific, Africa, Mexico, Chile, Brazil, Scandinavia , Germany, Poland, the Netherlands, Hungary, Italy, Spain, the United Kingdom, Turkey, India, Vietnam, Pakistan, Australia, and South Africa. As an authoritative research institution in Europe, EuPD Reacher […] Read more
US Investigations Into AD/CVD Circumvention Draws Howls Of Protests Updated On Mon, May 9th, 2022 by Saurenergy The Department of Commerce (DoC), which started the investigation in March this year has managed to roil solar industry firms in the US across the board, as uncertainty starts impacting projects. The DoC had initiated a solar anti-circumvention investigation based on a petition from a small U.S. company called Auxin Solar. The petition asks for […] Read more
Nexcharge Starts Production of Li-ion Battery Packs and Modules Updated On Fri, May 6th, 2022 by Saurenergy Nexcharge has announced the inauguration of its manufacturing plant at Prantij, Gujarat which is spread across 6 lakh square feet for the production of Li-ion battery packs and modules (Pouch/ Prismatic/ Cylindrical Nexcharge says that the facility has 6 fully automated assembly lines and testing labs with an installed capacity of 1.5 GWh and will […] Read more