Senior Engineer – Connectors Updated On Tue, Jan 2nd, 2024 by Saurenergy This role will be responsible for the design activities of Eaton’s electrical connectors, accessories, cables and conduit assemblies within its Aerospace Interconnect Technologies Division. This role supports project engineering in generating the CAD and drawings for new product development and product sustaining activities. Performs design engineering work from concept development, trade studies, design for manufacturability, […] Read more
Dam Safety and Maintenance Officer Updated On Fri, Dec 29th, 2023 by Saurenergy In the role as Dam Safety and Maintenance Officer, we are seeking a competent, self-driven and committed individual to provide oversight of all overall Dam Safety topic in the Statkraft India, including safeguarding compliance with all relevant requirements and communication with country specific dam safety authorities, as well as the compliance of Civil Infrastructure maintenance activities. […] Read more
ESMAP, World Bank Report Make Case For Energy-Plus Storage In India Updated On Fri, Dec 29th, 2023 by Saurenergy A recent report from the World Bank on energy storage program, introduced a framework for addressing intermittency challenges in solar and wind energy. The proposed solution involves integrating battery energy storage to manage variable energy output effectively. This report is by the Energy Management Assessment Program (EMAP) in collaboration with the World Bank (WB), the […] Read more
Senior Desing Engineer Updated On Thu, Dec 28th, 2023 by Saurenergy Responsibilities:- Prepare and review of plant & equipment 2D/3D layout, hole & foundation plans, ducting and piping layout, fabrication drawings. Prepare pipe isometric, BOQ, MTO. Prepare man hours estimation of detail design engineering activities. i.e. 3D layout, skids etc. Prepare work planning to compete the given task/project on time and within budget. P&ID review and […] Read more
Engineer – Renewables Project Development and Analytics Updated On Thu, Dec 28th, 2023 by Saurenergy In this role, you will be directly reporting to Head of Section- Project Development & Analytics. Project Development team is actively involved in pre-construction phase of a wind farm, performing wind resource and energy assessments, and site condition assessments at various phase of the project lifecycle. Broad Expectations:- Fully aligned with the characteristics of the […] Read more
Sustainment Project Manager Updated On Wed, Dec 27th, 2023 by Saurenergy PSP engineer responsible for coating equipment over their entire lifecycle, including documentation. Keep the bill of material (BOM) and documentation of coating equipment up-to-date Planning (strategic and operative) and realisation of PSP projects, while taking budget, cost and timeline into account. Duties & Responsibilities:- 1. Product Sustainment:- Responsibility of coating equipment over their entire lifecycle, […] Read more
Electrical Control and Instrumentation Design Engineer Updated On Tue, Dec 26th, 2023 by Saurenergy Undertake the design of Instrumentation & Electrical control for Howden equipment packages supplied for various industries. Execute Electrical and Controls Design activities relating to the packaging and Commissioning of Howden Compressors, Blowers and Fans for Indian Market in compliance to Howden std and customer/project requirements Assist all other Howden India departments in all aspects of […] Read more
Solar Faces Challenges in Procurement, Supply Chain Strategy: Rystad Updated On Tue, Dec 26th, 2023 by Saurenergy Rystad in its report lays importance on the need for development of procurement strategy for leading supply chain strategy, while prioritizing cost-effectiveness and sustainability. The report finds the supply chains system for oil and gas equipment and services to be relatively fragmented and geographically diverse. It found to be spread with suppliers coming from Europe, […] Read more
Parliamentary Standing Committee Recommends Incentives Under FAME Scheme Updated On Fri, Dec 22nd, 2023 by Saurenergy A standing committee report on ‘Promotion of Electric Vehicles (EV) In the Country’, mentions that, among category-wise EV, the production and sale of EV-three-wheeler vehicles is found to be highest in India. It recommends that the ministry should broaden the scope and extend FAME-II Scheme for at least three more years. This would support the […] Read more