India’s Renewable Energy Capacity To Reach 54% By 2047: NREL Updated On Mon, Jan 29th, 2024 by Saurenergy A recent report by the United States (US)-based organization National Renewable Energy Laboratory (NREL) anticipated an increase in the share of renewable energy (RE) generation from wind and solar in India to reach 54 percent by 2047. The NREL report evaluated, “In the base scenario, investments in battery storage are economic in 2030 is expected […] Read more
Engineer – Power System Studies Updated On Wed, Jan 17th, 2024 by Saurenergy The principal responsibilities and experience anticipated includes:- Candidate need work on steady state and transient power system studies. It desired that candidate have experience in specified studies in below points. Candidate need to work on Power System Studies, which includes following minimum specified studies: Load Flow studies. Short circuit studies. Protection coordination studies (relay coordination). […] Read more
Trillion Dollars Needed For Green Repowering Of Thermal Plants: iFOREST Report Updated On Tue, Jan 16th, 2024 by Saurenergy A latest report from International Forum for Environment, Sustainability and Technology (iFOREST) estimates that India would require more than a trillion dollars in the next 30 years to systematically phase down operations of the existing coal mines and Thermal Power Plants (TPPs) by 2050. The report talked about Just Transition, its financial requirements, and a […] Read more
Green Energy, EVs To Drive India’s GDP Growth, Estimates EY Report Updated On Tue, Jan 9th, 2024 by Saurenergy Ernest and Young (EY), in its latest report, said that the green energy industries and electric vehicles could prove to be triggering factors, driving India’s total GDP growth by 2047-48. The report states that this can also pave the way for India’s transition to a developed economy with a rise in the per capita income. The […] Read more
Model Validation Engineer Updated On Thu, Jan 4th, 2024 by Saurenergy Primary Responsibilities:- Oversee grid model sets used for BESS system grid connections, providing troubleshooting and technical support as needed. Manage and provide essential model documentation, technical information, and project-specific documentation when required. Collaborate closely with design teams to develop key design elements affecting grid connections, such as voltage control strategies and plant performance curves. Offer […] Read more
PM Launches Lakshadweep’s On-grid Solar Project With Battery Storage Updated On Wed, Jan 3rd, 2024 by Saurenergy Indian Prime Minister Narendra Modi inaugurated the first on-grid solar project with a Battery Energy Storage System (BESS) today in Lakshadweep. Developed by the Solar Energy Corporation of India (SECI), this initiative spans the islands of Kavaratti and Agatti, boasting a combined solar capacity of 1.7 MW and a sophisticated 1.4 MWh battery storage facility […] Read more
Top 12 Trends Of 2023 That Created Ripples In Indian Renewable Sector Updated On Tue, Jan 2nd, 2024 by Saurenergy For India, forming a backdrop to the whole year was the softening in global module prices, continuation of ALMM exemptions, and of course, the noise around carbon credits and green hydrogen. Which events actually made an impact? Which ones stood out and are most likely to make a real impact, and soon? We present below […] Read more
Emeren Reaches 1 GW Storage Milestone in Italy Updated On Tue, Jan 2nd, 2024 by Saurenergy Emeren Group Ltd , a leading global solar project developer, owner, and operator, has announced the successful sale of additional two Battery Energy Storage Systems (BESS) in Italy to Matrix Renewables (“Matrix”). This transaction follows the Company’s commitments outlined in the proprietary Development Service Agreement (DSA) signed jointly in June. Within just six months, Emeren […] Read more
India Awards More Than 8GW Of Energy Storage Tenders: IEEFA Report Updated On Thu, Dec 21st, 2023 by Saurenergy Indian policymakers have recognised the importance of energy storage systems (ESS) to the country’s evolving power landscape and have already awarded more than 8 gigawatts (GW) of such tenders, allocating 60% of these in 2023 alone, according to a new joint report by the Institute for Energy Economics and Financial Analysis (IEEFA) and JMK Research […] Read more