Analog Devices introduces ADSP-CM41x series of mixed-signal control processors to lower solar energy cost Updated On Mon, Apr 4th, 2016 by Saurenergy Analog Devices has introduced ADSP-CM41x series of mixed-signal control processors. The ADSP-CM41x series is designed to simplify system design, lower cost, and improve efficiency and safety in solar, energy storage, and electric vehicle infrastructure said the company in a statement. Price of solar panels and battery systems has dropped in recent years, creating the need […] Read more
Redflow launches home solar storage battery ZCell to take on Tesla and Panasonic Updated On Wed, Mar 30th, 2016 by Saurenergy Australia based battery developer Redflow has launched its first residential energy storage solution named ZCell made from easily recyclable and reusable components. Redflow‘s ZCell battery unlike its competitors, does not use lithium and is more recyclable than its competitors. It can store 10 kilowatt hours (kWh) of energy which will let users ‘timeshift’ solar power […] Read more
Australia, Brazil, And India Rank Among Top Five With Renewable Potential Updated On Wed, Feb 19th, 2025 by Saurenergy RatedPower’s, 2025 Global Renewable Trends Report reveals a high confidence in the future of renewables, with storage, solar, and green hydrogen as key growth areas over the next five years. RatedPower is a part of Enverus, an energy-dedicated SaaS company that leverages generative AI in its solutions. According to the respondents it surveyed, the U.S., […] Read more
H.G. Infra Sets Up Subsidiary To Expand Into BESS Sector Updated On Thu, Feb 6th, 2025 by Saurenergy Gujarat-based H.G. Infra has expanded into the Battery Energy Storage System (BESS) segment with the incorporation of its new subsidiary, ‘H.G. Gujarat BESS Private Limited’. The H.G. Infra announced the incorporation of the subsidiary in a regulatory filing. It said, “This Special Purpose Vehicle (SPV), H.G. Gujarat BESS Private Limited, has been incorporated as a […] Read more
As India Goes Past 100 GW Solar Milestone, No Time To Rest Updated On Wed, Jan 29th, 2025 by Saurenergy If ever there was a better use of the term turning point, inflection point, or simply the year when everything fell into place, 2024 would probably come the closest for the Indian solar market. These 365 days proved to be a harbinger of several good news for the different stakeholders in the industry, including solar […] Read more
Adani Green Q3 Results- PAT Rises 85% To Rs 474 crore Updated On Fri, Jan 24th, 2025 by Saurenergy Adani Green Energy Ltd (AGEL), the green energy developer arm of the Adani Group declared its financial results for Q3 FY25 on Thursday evening. The firm has posted a strong set of results, posting an over 85 percent rise in consolidated net profit to Rs 474 crore for the December quarter on the back of […] Read more
NHPC Issues Tranche-I 125 MW/500 MWh BESS Tender In Kerala Updated On Mon, Jan 20th, 2025 by Saurenergy NHPC has released a tender to build a battery energy storage system (BESS) to select developers for setting up 125 MW / 500 MWh (InSTS) connected standalone BESS (NHPC-Tranche-I-BESS). The project would be located in Kerala with viability gap funding (VGF) support (2024-25). NHPC has sought bids until February 21, 2025. The NHPC tender explained, […] Read more
GUVNL Issues Tender For 500 MW/1000 MWh BESS Project Updated On Sun, Jan 19th, 2025 by Saurenergy GUVNL has now released its 500/1000 MWh (Phase-VI) standalone Battery Energy Storage System (BESS) tender for 2025. The project is located in the home state of Gujarat. This is the 23rd standalone BESS tender and the 6th from GUVNL (one is in the draft stage on LDES). GUVNL is accepting bids until February 24, 2025. […] Read more
NTPC Issues Tender To Build Pilot BESS At Dadri Thermal Plant Updated On Thu, Jan 16th, 2025 by Saurenergy NTPC recently issued a tender to build and test a pilot project for proof of concept to replace diesel generators (DGs) with battery energy storage systems (BESS) at the Dadri Thermal Plant. The plant will be located at NTPC Dadri Stage-I. NTPC sought bids from interested parties until February 10, 2025. Prior Experience The bidder […] Read more