Trina Storage Unveils Latest Energy Storage Solutions Updated On Wed, Mar 19th, 2025 by Saurenergy Trina Storage, a global firm offering energy storage solutions and a business unit of Trinasolar, has unveiled its next-generation Elementa 2 Pro 5MWh energy storage system for the first time in Australia at the 2025 Energy Storage Summit held in Sydney. As one of the most influential events within the global energy storage industry, the […] Read more
India Must Aim For 600 GW Of Clean Energy By 2030: CEEW Updated On Wed, Mar 12th, 2025 by Saurenergy India needs to scale up to 600 GW of non-fossil-fuel capacity by 2030 to meet its growing electricity demand reliably and affordably, according to a new, independent Council on Energy, Environment and Water (CEEW) study launched at the National Dialogue on Powering India’s Future today in Delhi. The study, ‘How Can India Meet Its Rising […] Read more
India’s EV Sector Is Looking For Its Maruti Moment Updated On Wed, Mar 12th, 2025 by Saurenergy India’s automobile industry has witnessed transformative moments, but none as impactful as the Maruti Suzuki revolution of the 1980s. The Maruti 800 democratized car ownership, making vehicles accessible to the formidable ‘middle class’ and revolutionizing the Indian car market. Today, as the country stands on the cusp of an EV revolution thanks to the Indian […] Read more
Lectrix EV Partner With Bike Bazaar To Boost E-Mobiity Updated On Tue, Mar 11th, 2025 by Saurenergy Lectrix EV, the e-mobility arm of SAR Group, has announced a partnership with Bike Bazaar, a company involved in financing and renting electric two-wheelers, to drive large-scale EV adoption in the last-mile logistics segment. As part of this collaboration, Bike Bazaar will expand its fleet with 1000 new Lectrix electric two-wheelers, including high-range vehicles with […] Read more
Australia Set for Solar With 8 Hour BESS Backup Updated On Mon, Mar 10th, 2025 by Saurenergy Australian Infrastucture investor Quinbrook Infrastructure Partners, has announced plans to pioneer a global market first in advanced long duration energy storage solution developed in a technical collaboration with CATL, the world’s leading battery energy storage system (BESS) manufacturer. The groundbreaking storage solution, believed to be the world’s first genuine 8-hour battery at more than double […] Read more
R&D Engineer – Product Integration Electrical – IDC Updated On Thu, Mar 6th, 2025 by Saurenergy Responsible to conduct and manage type tests and design improvements related to Electrical aspects of product design, across the G&PQSS range to ensure the product portfolio remains at the forefront of technology. Including but not limited to performance improvements, cost reductions, increased manufacturability, and new application/new market developments. Responsibilities:- Managing requirements for product standardization (cost […] Read more
Energy Storage Lead Updated On Thu, Mar 6th, 2025 by Saurenergy The role shall focuses on developing cost models and designing solutions for BESS and PSP projects, particularly for renewable energy tenders (FDRE, RTC) and C&I consumers. Responsibilities include bottom-up costing, technology evaluation and LCOE/LCOS analysis for various storage durations and applications. The role involves structuring storage solutions for C&I clients under different models (Open Access, […] Read more
Saurenergy Explains: AC Block vs DC Block – Battle of BESS Updated On Thu, Mar 6th, 2025 by Saurenergy Renewable energy sources struggled to become a reliable alternative to fossil-based power for long. The Utility-scale battery energy storage systems (BESS) emerged as a panacea to renewable woes, with new renewable projects now even accommodating BESS as a part of the project. The landscape of utility-scale BESS is also now witnessing a dynamic evolution, with […] Read more
India’s Surge In Tendered Capacity Of RE Projects faces Multiple Risks Updated On Thu, Mar 6th, 2025 by Saurenergy India’s two consecutive years of record renewable energy tendering capacity has placed the country on a record capacity addition trajectory. With tenders equaling 73 GW in 2024 versus 58 GW in 2023, the numbers have surpassed even the central government’s own targets of 50 GW per year. These are among some of the findings of […] Read more