SECI Awards 200 MW FDRE Project To Altra Xergi At Rs. 8.50/kWh Updated On Fri, Jan 3rd, 2025 by Saurenergy Altra Xergi Power, an O2 Power subsidiary, recently secured a 200 MW project from Solar Energy Corporation of India (SECI). The company secured this project out of the initial 8,000 MWh (2000 MW x 4 hours) renewable energy tender. The Altra Xergi secured the project from SECI at the quoted tariff of Rs. 8.50/kWh to […] Read more
JSP, Adyant, Green Prairie, AMPIN, Adani Renewables Secure NTPC’s 1.2 GW Hybrid Project Updated On Tue, Dec 31st, 2024 by Saurenergy As the year comes to an end, NTPC, a Maharatna company, has announced five winners of its 1.2 GW wind-solar hybrid project (Hybrid 02) tender. NTPC awarded the project to JSP Green (Jindal Renewables), Adyant Enersol (Datta Infra), Green Prairie Energy IV (EverGreen Power), AMPIN Energy Utility, and Adani Renewables Energy Holding Twelve (Adani Green). […] Read more
Winning Bids Cross Rs 3/kWh In SECI’s 1 GW Solar Tender Updated On Thu, Dec 26th, 2024 by Saurenergy In an ominous sign of changing market dynamics, SECI’s 1000 MW Tranche XVIII tender for ISTS connected solar projects has attracted winning bids, all over Rs 3/kWh. The tender, released in September this year, has ReNew Solar Power( 250 MW at Rs 3.04), Acme Solar holdings (300 MW at Rs 3.05) and Adani Green Energy […] Read more
NTPC 1.2 GW Solar Project Results- 6 Winners Announced Updated On Tue, Dec 24th, 2024 by Saurenergy NTPC has announced six winners for its 1.2 GW solar project tender with a greenshoe option. The winners are Bharat Petroleum Corporation Limited (BPCL), Onward Solar Power, ReNew Solar Power, Illuminate Hybren, Adyant Enersol, and DineshChandra R Aggarwal. Collectively, these projects amount to 1,020 MW, with an additional greenshoe option of 600 MW. According to […] Read more
Prozeal, Kintech & SAEL Secure GUVNL’s 500 MW Solar Auction Updated On Thu, Dec 19th, 2024 by Saurenergy GUVNL recently announced seven winners of its 500 MW grid-connected solar power projects with an additional 500 MW greenshoe option. Under its Phase XXV auction, it allocated bids to S.B.B. Mouldings, Kintech Synergy, Enertech Fuel Solutions, Prozeal Green Energy, Ausom Enterprise, Drashta Green Power, and SAEL Industries. The tender for this project was released in […] Read more
NHPC Floats 1.2 GW Wind-Solar Hybrid Tender With Greenshoe Option Updated On Wed, Dec 18th, 2024 by Saurenergy In a bid to procure hybrid power, NHPC recently floated a tender to supply 1,200 MW of power from wind-solar hybrid power projects, with a greenshoe option, The tender also said these projects could be established with or without Energy Storage Systems (ESS) anywhere in India. NHPC set 16th January 2025 as the last date […] Read more
Oriana Power Vows Rs 10,000cr Investments In Rajasthan’s RE Sector Updated On Mon, Dec 16th, 2024 by Saurenergy Renewable energy company Oriana Power today announced its plans to invest around Rs 10,000 crore for renewable projects in Rajasthan. The green firm signed a Memorandum of Understanding (MoU) with the state in this regard. The investment has been planned for the development of multiple clean energy projects encompassing solar, floating solar, Green Hydrogen, and […] Read more
Mahindra Adds New Subsidiary Velos Hybren To Expand RE Portfolio Updated On Wed, Dec 11th, 2024 by Saurenergy Mahindra Susten (MSPL) recently incorporated Velos Hybren Private Limited (Velos Hybren) as its step-down subsidiary to spur renewable energy growth. Velos Hybren has been established to produce and sell power, generate electricity, act as an Independent Power Producer (IPP), and facilitate distributed energy solutions, including rooftop solar installations for commercial, industrial, institutional, and residential segments. […] Read more
Deputy General Manager Updated On Thu, Dec 5th, 2024 by Saurenergy Responsibilities:- System Design & Engineering:- Review load profiles and engineer Battery Energy Storage Systems (BESS) to meet project goals. Design, select, and size battery systems, optimizing parameters for performance. Utilize simulation tools (e.g., MATLAB, Homer) for battery system sizing and performance modeling. Technical Expertise:- Deep understanding of BESS design, battery chemistry, performance modeling, and lifetime […] Read more