SunAlpha Energy Wins 2 MW Rooftop Solar Capacity under Capex Model Updated On Sat, Jan 18th, 2020 by Saurenergy Rajasthan based SunAlpha Energy on Saturday said that it has won an aggregate 2,000 kWp of capacity under the state-owned Solar Energy Corporation of India’s (SECI’s) rooftop solar tender for government buildings. Under SECI’s global competitive bidding for the implementation of 97.5 MWp grid-connected rooftop solar photovoltaic (PV) system, the successful bidders and developers will […] Read more
BHEL Tenders for HT Cables for 147 MW Floating Solar Projects Updated On Fri, Jan 10th, 2020 by Saurenergy BHEL has issued a tender for the supply of 33 KV (E) HT cables for 100 MW NTPC Ramagundam, the 25 MW Simhadri and 22 MW Kayamkulam floating solar projects Bharat Heavy Electricals Limited (BHEL) has issued a tender, inviting bids for the supply of 33 KV (E) High Tension (HT) cables for 100 MW […] Read more
India has an Offshore Wind Energy Potential of 70 GW, 0 GW Fulfilled Updated On Thu, Jan 9th, 2020 by Saurenergy MNRE has revealed that India has an offshore wind energy potential of around 70 GW, mainly distributed along parts of the coast of Gujarat and Tamil Nadu. The Ministry of New and Renewable Energy (MNRE) has revealed that based on studies, India has an offshore wind energy potential of around 70 GW, mainly distributed along […] Read more
BHEL Tenders for Floatation Platform for 22 MW Solar Project Updated On Mon, Jan 6th, 2020 by Saurenergy BHEL has tendered s for developing the complete floatation platform for the 22 MW floating solar plant at NTPC Kayamkulam in Kerala. Bharat Heavy Electricals Limited (BHEL), India’s largest engineering and manufacturing enterprise has issued a tender, inviting bids from eligible firms for developing and fabricating a complete floatation platform for the 22 MW floating […] Read more
Discoms Dues to Power Generators Rises to Rs 81k Cr in November Updated On Mon, Jan 6th, 2020 by Saurenergy Power producers’ total outstanding dues owed by Discoms increased around 45 percent to Rs 81,085 crore in November 2019. Power producers’ total outstanding dues owed by Discoms increased around 45 percent to Rs 81,085 crore in November 2019 over the same month previous year, reflecting stress in the sector. Discoms owed a total of Rs 54,834 […] Read more
Govt Okays 2,636 New EV Charging Stations Under FAME India Phase-II: Javadekar Updated On Sat, Jan 4th, 2020 by Saurenergy With an aim to provide further fillip to e-mobility in the country, government has approved 2,636 new electric vehicles (EVs) charging stations in 62 cities across 24 states and union territories under the phase-II of FAME India (Faster Adoption and Manufacturing of Electric Vehicles in India) scheme, Minister of Heavy Industries & Public Enterprises, Prakash Javadekar said. Out […] Read more
PGCIL Tenders for Transformer Package for Kurnool Wind/Solar Energy Zone Updated On Thu, Jan 2nd, 2020 by Saurenergy PGCIL has issued a tender for setting up of a 400KV transformer package at Kurnool-III PS for the Kurnool Wind/ Solar Energy Zone in Andhra Pradesh The Power Grid Corporation of India (PGCIL) has issued a tender for setting up of a 400KV transformer package TR-25 for 4 x 500 MVA, 400/220 kV, 3-Phase ICTs […] Read more
ICRA Revises Outlook from Stable to Negative for RE Sector Updated On Tue, Dec 31st, 2019 by Saurenergy On the back of delays in both payments from Discoms and execution of projects, credit rating agency ICRA has revised the year-end outlook for India’s renewable energy (RE) sector from ‘stable’ to ‘negative’. According to the rating agency, country’s renewable energy sector is facing headwinds due to long pending payments by the state Discoms (power […] Read more
The Potholes of 2019 for India’s Solar Drive Updated On Tue, Dec 24th, 2019 by Saurenergy Looking back at 2019, there is absolutely no doubt today, that it has not been a memorable year for Solar power in India. Generators or manufacturers. With a closing installation figure of barely 7 GW as tracked by us, almost every hope from 2018 has been belied. The bad part? Some of the biggest obstacles […] Read more