Lead Engineer/Deputy Lead Engineer/Senior Updated On Fri, Sep 2nd, 2022 by Saurenergy To lead, Guide & assist the team of Job Engineers/3D Modelers/Designers & Other project supporting personnel to execute FEED/Detailed engineering activities in the field of Structural. Minimum 3 Years of experience as Lead Structural Engineer in offshore structures design. The role mandates previous experience in offshore platform design and including substructure, topsides and bridges. A […] Read more
Botswana Power Corporation Awards Scatec ASA First Large Scale Solar Contract Updated On Fri, Sep 2nd, 2022 by Saurenergy Norway-based renewable energy leader Scatec has said that it has signed a binding 25-year power purchase agreement (PPA) with and the Botswana Power Corporation (BPC) for the construction of a solar PV facility with a contracted capacity of 50 megawatt. The solar facility will be set up in Selibe Phikwe, a former mining town located […] Read more
Li-Battery Revolution is Key to India’s Fast-Paced EV Adoption Updated On Tue, Aug 30th, 2022 by Saurenergy Founded by its MD, A K Shukla, Sanvaru Technology is a leading manufacturer that specializes in providing innovative and customized Lithium-Ion Battery Storage solutions (BESS). Under the leadership of A K Shukla, who is a seasoned electronics and instrumentation engineer with over 30 years of diverse industrial experience, the organisation has grown from strength to […] Read more
Junior Engineer Updated On Wed, Aug 24th, 2022 by Saurenergy Candidates should have a degree in Chemical Engineering with relevant years of experience in Front End & Detailed Design in the hydrocarbon industry. Candidate must hands-on experience in basic process simulation and must have knowledge of software like HYSYS, Flare System Analyzer, etc. Experience in Design & Engineering of refinery, petrochemical, gas processing plants and […] Read more
Engineer Rotary Updated On Wed, Aug 24th, 2022 by Saurenergy Carry out FEED, Proposal and Detail Engineering of Rotary equipment / Packages including manhour estimation. Experience in engineering of Rotating equipment (viz: Pumps, Compressors, Fans, Blowers, Steam and Gas Turbines) and Packages viz: Utility / Process plant packages like ETP, Cooling Tower, DM Water , PSA, Fire water Pump package, in Chemical , Petrochemical and […] Read more
Engineer – Structure Updated On Wed, Aug 10th, 2022 by Saurenergy Responsibilities:- Delivering the project from precontract to construction and handover stages. Directing contractors on their roles and responsibilities with regard to health and safety procedures and comply with safety sustainability policy and procedures. Overseeing and directing construction projects from conception to completion. Reviewing the project in-depth to schedule deliverables and estimating costs. Overseeing all onsite […] Read more
General Manager- MEP Updated On Wed, Aug 10th, 2022 by Saurenergy Responsibilities:- Performing risk and value management and cost control functions. Reviewing the overall status of the MEP works reporting on the progress of all MEP aspects of the project to the project director, design and commercial team. Scheduling of design reviews at all gateways and control points. Organising and managing technical review team resources and […] Read more
ReNew Power Will Invest $8 Billion In Green Hydrogen in Egypt Updated On Tue, Aug 2nd, 2022 by Saurenergy Gurugram based ReNew Power has signed a Memorandum of Understanding (MoU) with the Egyptian government for the development of projects in Egypt for the production of green fuels. The General Authority for Suez Canal Economic Zone (SCZONE), the Sovereign Fund of Egypt (TSFE), the Egyptian Electricity Transmission Company (EETC) and the New and Renewable Energy […] Read more
Pakistan To Build 300 MW Solar Power Plant In Gwadar Instead Of Coal Based Plant Updated On Thu, Jul 28th, 2022 by Saurenergy The economic downturn and balance of payment crisis can have a noble effect. In Pakistan, the Power Division now wants to abandon the planned 300 MW coal power plant at port city of Gwadar and instead build a solar power plant of the same capacity in order to relieve itself from importing more coal. […] Read more