Uttar Pradesh Floats Tender for 75 MW of Grid-Connected Solar Projects Updated On Wed, Mar 24th, 2021 by Saurenergy Uttar Pradesh New and Renewable Energy Development Agency (UPNEDA) has floated an e-tender for setting up a 75 MW grid-connected solar PV power project in UP solar park, Uttar Pradesh. As part of the Government of India’s target to achieve a cumulative capacity of 100 GW Solar PV installations by the year 2022, UPNEDA wishes […] Read more
Solar Firms Almost Unanimous on 10 kW Rule for Net-Metering – It’s a Disaster Updated On Wed, Mar 24th, 2021 by Saurenergy While industry reaction to the new rules from the Ministry of Power that mandates net metering upto a limit of 10 kW only have been well reported, we decided to speak to installers across states to get a broader view. What we see is a very clear divide between a vast number of smaller installers, […] Read more
Adani to Develop Green Hydrogen Projects in India, Partners With Maire Tecnimont Updated On Tue, Mar 23rd, 2021 by Saurenergy Maire Tecnimont and Adani Enterprises will explore the development of industrial projects producing chemicals, ammonia and hydrogen in India Italian conglomerate Maire Tecnimont has announced that it has, through its subsidiaries NextChem, Stamicarbon and MET Development (MET DEV), signed a Memorandum of Understanding (MoU) with Adani Enterprises to explore the development of industrial projects using […] Read more
Adani Green Energy Receives LOA for 300 MW Wind Project From SECI Updated On Mon, Mar 22nd, 2021 by Saurenergy AREHFL, a subsidiary of Adani Green Energy, has received the LOA to set-up a 300 MW wind project under SECI’s 1200 MW (Tr-X) tender. AREHFL, a subsidiary of Adani Green Energy (AGEL), had participated in the tender issued by the Solar Energy Corporation of India (SECI) for setting up 1,200 MW ISTS-connected wind power projects […] Read more
SECI Reschedules Pre-bid Meeting for its 1785 MW Rajasthan Solar Tender Updated On Wed, Mar 17th, 2021 by Saurenergy SECI has notified that it has rescheduled the pre-bid meeting for its tender for setting up 1785 MW solar projects in Rajasthan (Tranche-IV). The Solar Energy Corporation of India (SECI) has notified that it has rescheduled the pre-bid meeting for its tender for the selection of Solar Power Developers (SPDs) for setting up 1785 MW […] Read more
SECI 750 MW Tranche X Wind Auctions- Adani Bids Rs 2.77 to win, Ayana at Rs 2.78 Updated On Tue, Mar 16th, 2021 by Saurenergy Life returned to the Wind Energy pipeline with the first pure wind energy auction by SECI in over 18 months. With a reserve price of Rs 2.99, Adani Renewable Energy walked away with a 300 MW allocation at Rs 2.77/kWh, while Ayana Renewable Power won 300 MW at Rs 2.78. Evergreen Power ventures Mauritius won […] Read more
Adani Greens Kamuthi Project Turns Water Positive, Signals The Future for Large Projects Updated On Fri, Mar 12th, 2021 by Saurenergy The announcement of the groups most prestigious and early large project turning water positive will set a benchmark for almost all future projects to follow Adani Green Energy’s 648 megawatt Kamuthi Solar plant in Tamil Nadu, has been declared the first of its scale to be water positive. The announcement is a welcome step by […] Read more
Longi Solar Top Module Supplier to India In 2020, Says Report Updated On Tue, Mar 9th, 2021 by Saurenergy China’s LONGi Solar, a global leader in high-efficiency mono-crystalline solar cells and modules, has been named India’s market leader based on module shipments in 2020, according to a recent study by Gurugram-based research firm JMK Research. For LONGi, the numbers will be gratifying, as it has taken the firm just over 2 years to make […] Read more
Adani Green Commissions 100 MW Gujarat Wind Project Ahead of Schedule Updated On Mon, Mar 8th, 2021 by Saurenergy Adani Green Energy has commissioned a 100 MW wind power plant in Kutch, Gujarat five months ahead of its schedule. AWEKTL, a subsidiary of Adani Green Energy Limited (AGEL), has announced that it has commissioned a 100 MW wind power plant in Kutch, Gujarat five months ahead of its schedule. The 100 MW wind project […] Read more