SECI Signs off 2021 With 1785 MW Tender Award At Rs 2.17/unit Updated On Sat, Dec 25th, 2021 by Saurenergy In a late announcement yesterday, the Solar Energy Corporation of India announced the bid winners of its 1785 MW Solar tender (Tranche IV) for Rajasthan, whose bid deadline was May 21, with a final winning price of Rs 2.17 /unit. The final winners list has a mix of PSU, private and foreign forms in it, […] Read more
Andhra Govt Finally Withdraws 6400 MW Tender, Sticks With Buy From SECI Updated On Fri, Dec 24th, 2021 by Saurenergy In a move that was widely expected for the past few months, the Andhra Pradesh government has dropped its 6400 MW solar tender. the state government had tried to pull off its own tender with conditions separate from central tenders, to prove a point about its claim of paying too high a price for previous […] Read more
Azure Power Inks 2333MW PPA with SECI Under 4GW Mfg-linked Projects Updated On Mon, Dec 20th, 2021 by Saurenergy Azure Power has signed its largest ever Power Purchase Agreements (PPAs) with the Solar Energy Corporation of India (SECI) for a capacity of 2,333 MW of interstate transmission system (ISTS)-connected solar power projects under the 4 GW manufacturing linked projects, announced the company in a recent official statement. The news was expected since last week, […] Read more
Senior Manager – Module Production Updated On Fri, Dec 17th, 2021 by Saurenergy Incumbent shall be responsible for production targets of Module plant & various developmental activities in module lines, in addition to shop floor control, to increase production throughput and Yield parameters. Role & Responsibilities:- Responsible for Proper Manpower handling for Production line. Handling of Entire Production Line of GW scale Ensuring day wise & shift wise […] Read more
Acquisitions in India’s RE sector Up Over 300% in Value terms in 2021 Updated On Wed, Dec 15th, 2021 by Saurenergy The total value of acquisitions in India’s renewable energy sector surged by more than 300% to $ 6 billion in the first ten months of 2021 (till October) from less than $1.5 billion reported in 2020, according to an independent study released today by the CEEW Centre for Energy Finance (CEEW-CEF) and the International Energy […] Read more
AGEL Signs 4667 MW PPA, Manufacturing Linked Project Moves Into High Gear Updated On Tue, Dec 14th, 2021 by Saurenergy Adani Green Energy Ltd (AGEL), the renewable energy arm of the diversified Adani Group, has signed an agreement with the Solar Energy Corporation of India (SECI) to supply 4,667 MW of green power. The firm claims this is the world’s largest ever green power purchase agreement. It also marks decisive movement on the 8000 MW […] Read more
Assistant Manager – Operations & Maintenance Updated On Mon, Dec 13th, 2021 by Saurenergy Test or evaluate photovoltaic (PV) cells or modules. Review specifications and recommend engineering or manufacturing changes to achieve solar design objectives. Perform thermal, stress, or cost reduction analyses for solar systems. Develop standard operation procedures and quality or safety standards for solar park. Provide technical direction or support to installation teams during installation, start-up, testing, […] Read more
Senior Engineer Updated On Mon, Dec 6th, 2021 by Saurenergy Test or evaluate photovoltaic (PV) cells or modules. Review specifications and recommend engineering or manufacturing changes to achieve solar design objectives. Perform thermal, stress, or cost reduction analyses for solar systems. Develop standard operation procedures and quality or safety standards for solar park. Provide technical direction or support to installation teams during installation, start-up, testing, […] Read more
India’s Solar Path-The Firms, Individuals and Organisations That Will Matter Updated On Wed, Dec 1st, 2021 by Saurenergy 2021 has marked a return to bump up in capacity addition in solar, after the last peak in 2017-18 when the country added close to 9.5 GW taking solar to the top among all energy options for capacity added. With this year likely to see over 11 GW of fresh capacity addition, it says something […] Read more