SECI Awards Only 970 MW of 2 GW Wind Tender, Vena and JSW Winners Updated On Mon, Aug 17th, 2020 by Saurenergy SECI recently concluded the auction for its 2 GW ISTS-connected wind projects tender, awarding 970 MW capacity to Vena Energy (L1) and JSW Energy (L2). The Solar Energy Corporation of India (SECI) recently concluded the auction for its 2 GW ISTS-connected wind projects tender. The nodal agency has awarded only 970 MW capacity to the […] Read more
NHPC Raises Rs 750 Cr at 0.30% Lower Rate for 10 Yrs Updated On Thu, Apr 23rd, 2020 by Saurenergy State-owned NHPC Ltd has raised Rs 750 crore on Thursday through the private placement of bonds at a very competitive interest rate of 6.80 percent per annum. Further, the company has raised the loan amount for a period of 10 years. Its coupon rate is 6.80 percent, which is lowest in the current fiscal and […] Read more
India EV Battery Swapping Propelled by low Penetration of Charging Stations: P&S Intelligence Updated On Wed, Mar 4th, 2020 by Saurenergy Due to increased run-time and improved remunerative prospects for shared e-mobility drivers, the demand for EV battery swapping is rising in India Due to increased run-time and improved remunerative prospects for shared e-mobility drivers, the demand for electric vehicle (EV) battery swapping is rising in India, a new report by market research and consulting services […] Read more
Safeguard Duty Knots. Azure Power Wins Reprieve from CERC Updated On Wed, Feb 5th, 2020 by Saurenergy Azure Power, which had gone to the central Electricity Regulatory Commission (CERC) to get compensation from SECI for two of its bids, due to the imposition of Safeguard Duty (SGD) on 30.07.2018, has found a willing ear at CERC. The two cases here were petition numbers 356/MP/20198, and 51/MP/2019. In an order that mirrors the […] Read more
CERC Approves Rs 2.77/kWh Tariff for 1200 MW Wind Projects Updated On Wed, Dec 11th, 2019 by Saurenergy CERC has given its go-ahead for the 1200 MW wind projects tendered by SECI and approved the tariff rate of Rs 2.77 per kWh. The Central Electricity Regulatory Commission (CERC) in its latest notification has given its go-ahead for the 1200 MW wind projects tendered by the Solar Energy Corporation of India (SECI) and approved […] Read more
Power Ministry Proposes Tariff Rebates on Advance Payments by Discoms Updated On Tue, Nov 19th, 2019 by Saurenergy The Ministry of Power has advised SERCs to establish reduction of generation/ transmission tariffs in cases of full or advance payments by state Discoms The Ministry of Power (MoP) has issued an order, advising state electricity regulatory commissions (SERCs) to establish the reduction of generation or transmission tariffs in cases of full or advance payments […] Read more
TBEA To Open GW-class PV Inverter Facility in India on November 29 Updated On Fri, Nov 15th, 2019 by Saurenergy TBEA Xi’an Electric Technology Co. Ltd., an arm of TBEA Group, will inaugurate its GW-class photovoltaic (PV) inverter facility in India on November 29 this year. The firm has emerged as a strong player from its base in China, establishing 2 R&D centers in Xi’an and Munich, Germany. With more than 10 major scientific research […] Read more
Adani Green Energy Commissions 50 MW Wind Capacity in Kutch Updated On Tue, Oct 22nd, 2019 by Saurenergy Adani Green Energy has commissioned 50 MW wind generation capacity in Kutch, a part of the 725 MW wind projects then firm is implementing in the region Adani Green Energy Ltd (AGEL) has announced through a corporate filing that it has commissioned 50 megawatts (MW) wind generation capacity in Kutch, Gujarat. The capacity commissioned is a […] Read more
Predictive Maintenance Key to Enhancing Safety and Productivity of Power Sector Updated On Fri, Oct 18th, 2019 by Saurenergy A new report looks at how predictive maintenance is becoming key to the power sector as it extends the operational life of infrastructure, while also enhancing safety & productivity Predictive maintenance is becoming integral to the power sector as it extends the operational life of field equipment and infrastructure in order to improve organisational profitability, […] Read more