SUBSCRIBE NEWS LETTER

about solar energy

Tender For 6.8 MW Wind Power Plant Issued in Daman & Diu

The last date of bid submissions is April 22, 2019, the technical bods opening will take place on April 23, 2019, and price bid opening on April 30, 2019. The electricity department of Daman on behalf of the President of India has invited tenders from reputed manufacturers/EPC contractors for setting up of 6.8 MW of […]

Read more

SECI Floats Tender For 1200 MW Wind Power Projects Tranche-VII

The detailed RfS Document shall be available for download by February 22, 2019. The Solar Energy Corporation of India (SECI) has issued tender inviting bids for setting up of 1200 MW ISTS Connected Wind Power Projects (Tranche-VII) on a pan India basis.  The detailed Request for Selection (RfS) Document shall be available for downloading by February 22, […]

Read more

PM Dedicated Rs 4,976 Cr Transmission Project to the Nation

The Power Ministry claimed in a statement that, this Rs 4,976 crore project will improve the power system in Western UP along with Bundelkhand. With an aim to improve the power system, Prime Minister Narendra Modi dedicated PowerGrid 765/400 kV Orai Sub-station & 765 kV Aligarh Sub-station and associated lines to the Nation at a […]

Read more

Work Begins on Adani’s 100% RE Data Centre

The centres with a 5 GW solar park would be a first-of-its-kind 100 percent renewable energy powered project in the world. Andhra Pradesh Chief Minister N. Chandrababu Naidu on Thursday laid the foundation stone for Data Centre and Technology Park of Adani Group in the port city of Vizag. The ground-breaking ceremony for the facility coming up at Kapuluppada […]

Read more

NIT FOR SETTING UP OF 1200 MW ISTS-CONNECTED WIND POWER PROJECTS IN INDIA (TRANCHE-VII)

Solar Energy Corporation of India Ltd. (SECI) invites online bids for Setting up of 1200 MW ISTS Connected Wind Power Projects (Tranche-VII) on a pan India basis. The detailed Request for Selection Document (RfS) shall be available for downloading by 22.02.2019 onwards on www.tcil-india-electronictender.com. Prospective bidders are requested to remain updated for any notices/amendments/clarifications etc. to the […]

Read more

RfS For Procuring Power From Hybrid Projects in Andhra Pradesh

The last date for the submission of bids is March 18, 2019. The Southern Power Distribution Company of Andhra Pradesh Limited (APSPDCL) and Eastern Power Distribution Company of Andhra Pradesh Limited (APEPDCL), jointly referred as APDISCOMs, have issued a Request for Selection (RfS) to procure 600 MW of power from Wind-Solar Hybrid Projects with Energy […]

Read more

BIS Extension For SPV Module Manufacturers

The date of self-certification relaxation stands extended from January 1, 2019, to March 31, 2019. The Ministry of New and Renewable Energy (MNRE) has extended the deadline for the self-certification of solar photovoltaic (SPV) modules until March 31, 2019. The Schedule with the date of coming into force was initially September 5, 2018. However, after […]

Read more

PPA For 250 MW Wind Farm Signed in Egypt

The project will produce more than 1000GWh a year, powering the equivalent of over 350,000 homes in Egypt. Lekela, the renewable power company that delivers utility-scale projects across Africa, has signed a power purchase agreement (PPA) with the Egyptian Electricity Transmission Company (EETC) for its 250MW wind farm project in the Gulf of Suez, near […]

Read more
      SUBSCRIBE NEWS LETTER
Scroll