NIT For 1200 MW Wind-Solar Hybrid Projects Tranche-II Updated On Thu, Feb 28th, 2019 by Saurenergy SBE Renewable and Mahoba Solar Private Limited were awarded a total 840 MW capacity of the tendered 1200 MW capacity of the Tranche-I tender. The Solar Energy Corporation of India (SECI) has issued a Notice Inviting Tenders (NIT) inviting online bids for setting up of 1200 MW ISTS-Connected Wind-Solar Hybrid Power Projects (Tranche-II) on a […] Read more
RESULTS OF E-BIDDING AND E-RA FOR 1200 MW ISTS-CONNECTED WIND-SOLAR HYBRID POWER PROJECTS (TRANCHE-I) Updated On Wed, Feb 13th, 2019 by Saurenergy For Full information: Click here Read more
Andhra Pradesh Releases New Wind-Solar Hybrid Policy Updated On Mon, Jan 7th, 2019 by Saurenergy The Government of Andhra Pradesh has set a target to achieve 18,000 MW of renewable energy capacity by the year 2021-22. Keen to harness the huge solar and wind potential of Andhra Pradesh, the state has launched its new ‘Andhra Pradesh Wind-Solar Hybrid Power Policy – 2018’. The Government of Andhra Pradesh has set a […] Read more
SECI Issues RfS for 1200 MW Wind-Solar Hybrid Power Projects Updated On Wed, Jan 2nd, 2019 by Saurenergy The maximum tariff payable to each WPD is fixed at Rs 2.85/kWh for the entire term of 25 years. State-owned Solar Energy Corporation of India (SECI) has issued Request for Selection (RfS) document for setting up of 1200 MW ISTS connected wind power projects (Tranche-VI) on “Build Own Operate” basis. This 1200MW solar-wind hybrid tender […] Read more
Government to Reverse Auction Wind-Solar Hybrid Project Updated On Mon, Nov 26th, 2018 by Saurenergy The tender had received a tepid response from the industry with just Adani Green Energy and SB Energy bidding for the project. The government has decided to go for a reverse auction for its first wind-solar hybrid tender for which two companies submitted their bid. Adani Green Energy and Softbank-backed SB Energy will compete for […] Read more
Amendment – 4 : RFB for 160 mw Solar-Wind Hybrid Power Plant with Bess at Ramagiri, AP, India Updated On Sat, Oct 27th, 2018 by Saurenergy Employer: Solar Energy Corporation of India Limited (SECI), New Delhi, India Project: Innovation in Solar Power and Hybrid Technologies Project Contract title: Design, Engineering, Supply, Construction, Erection, Testing & Commissioning of 160 MW Solar-Wind Hybrid Power Plant with BESS including 10 Years Plant O&M under International competitive bidding at Ramagiri, Anantapur district, Andhra Pradesh, India RFB […] Read more
Extension of Bid Submission Deadline: RFB for mw Solar-Wind Hybrid Power Plant with Bess at Ramagiri, Anantapur, A.P., India Updated On Thu, Oct 18th, 2018 by Saurenergy Amendment-3 Employer: Solar Energy Corporation of India Limited (SECI), New Delhi, India Project: Innovation in Solar Power and Hybrid Technologies Project Contract title: Design, Engineering, Supply, Construction, Erection, Testing & Commissioning of 160 MW Solar-Wind Hybrid Power Plant with BESS including 10 Years Plant O&M under International competitive bidding at Ramagiri, Anantapur district, Andhra Pradesh, […] Read more
Siemens Gamesa Commissions NTPC’s 3.375 MW Wind-Solar Hybrid Project Updated On Thu, Aug 23rd, 2018 by Saurenergy This is the first pilot renewable energy hybrid project in India that was developed from the engineering design stage, according to Siemens Gamesa. Spanish Renewable energy manufacturer and provider, Siemens Gamesa has commissioned a 3.375 MW wind-solar hybrid power project for the state-run National Thermal Power Corporation (NTPC). This is the first pilot renewable energy […] Read more
SECI seeks Bids for Tender of 160 MW Solar-Wind Hybrid Power Plant in Andhra Pradesh Updated On Thu, Aug 16th, 2018 by Saurenergy The tender includes design, engineering, supply, construction, erection, testing & commissioning including 10 years plant O&M under International competitive bidding. Under the ‘Innovation in Solar Power and Hybrid Technologies Project’, Solar Energy Corporation of India (SECI) has floated tender for 160 MW of solar-wind hybrid power plant with Battery Energy Storage System (BESS) in Anantapur […] Read more