Tata Power Gets LOI for 250 MW Solar Power From MSEDCL Updated On Mon, Sep 20th, 2021 by Saurenergy TP Saurya Limited (TPSL), a wholly owned subsidiary of Tata Power, received the ‘Letter of Intent’ (LoI) from Maharashtra State Power Generation Co. Ltd. (MAHAGENCO) for setting up of 250 MW Grid-Connected Solar Photovoltaic Power plant in Maharashtra. The project has been awarded to TPSL through Tariff-based competitive bidding followed by e-Reverse auction. The Company […] Read more
Chinese Automakers Develop Tech to Seize Hybrid Market: Report Updated On Fri, Sep 17th, 2021 by Saurenergy The sales volume of new hybrid passenger cars should account for 50%-60% of traditional energy passenger cars by 2025, 75%-85% by 2030, and 100% by 2035, finds a new a new report. The study claims that Chinese automakers have developed hybrid systems independently to seize the hybrid market. The “Global and China Hybrid Vehicle Industry […] Read more
NTPC Addresses Its Wind Capacity with 300 MW Tender for Projects Updated On Thu, Sep 9th, 2021 by Saurenergy Power major NTPC Limited, which has set a 60 GW renewable target for 2032,has invited bids to develop 300 MW of interstate transmission system (ISTS)-connected wind energy projects anywhere in India. The tender follows earlier wind tenders from the utility this year. It also marks the continuing recovery in the wind space after a poor […] Read more
GESCOM Seeks Bids to Empanel Agencies for 10 MW Solar Project Updated On Tue, Sep 7th, 2021 by Saurenergy Gulbarga Electricity Supply Company Limited (GESCOM) has invited Expression of Interest (EoI) for the empanelment of agencies for a 10 MW rooftop solar project in Karnataka. Interestingly, this is the second effort by the discom to empanel firms, after a previous effort in March earlier this year seems to have failed. The scope of the […] Read more
SECI’s 1200 MW Tranche XI Wind Tender Sees Winning Bids at Rs 2.69/Unit Updated On Fri, Sep 3rd, 2021 by Saurenergy Wind Energy continues to charge up in 2021, with SECI’s Tranche XI tender attracting winning bids at Rs 2.69/unit. The winning firms this time were ReNew Power (300 MW), Sembcorp through its subsidiary Green Wind Infra Energy (180 MW), Evergreen Power through Anupavan Renewables (150 MW). Adani Green scooped up the largest parcel of 450 […] Read more
MSEDCL Issues Tenders for 800 MW Wind Projects Updated On Tue, Aug 24th, 2021 by Saurenergy The Maharashtra State Electricity Distribution Company (MSEDCL) has recently issued two requests for selection (RfS) to procure 500 MW of wind power from intra-state wind power projects and 300 MW of wind power from new grid-connected inter-state and intra-state wind projects. In total, MSEDCL will procure 800 MW wind power on a long-term basis through […] Read more
Will Concentrated Solar Power be Reborn? Report Says Yes Updated On Thu, Aug 19th, 2021 by Saurenergy Concentrated Solar Power (CSP), which has lain moribund for a decade, is about to be reborn, according to a new report from Rethink Technology Research, with global capacity to increase several times over by 2030. The study expects CSP to claim its place serving power grids, green hydrogen complexes, and industrial process heat in California, […] Read more
Norwegian Company gets €957,000 Grant for Mobile Offshore Wind Units Updated On Thu, Aug 19th, 2021 by Saurenergy Norwegian offshore drilling contractor Odfjell Oceanwind has been awarded a NOK 10 million (EUR 957,000) pre-project grant from Enova, Norway’s fund for climate and energy technologies, for maturing its first commercial contracts for Mobile Offshore Wind Units (MOWUs) and WindGrid for electrification of oil and gas installations. The grant is awarded under Enova’s full scale innovative […] Read more
3.5 GW Solar Capacity Added in H1 of 2021 in India, Says Report Updated On Thu, Aug 19th, 2021 by Saurenergy A report by renewable energy research firm JMK Analytics says that India added 3.5 GW of solar capacity in the first six months of the financial year 2022. It places cumulative renewable capacity at 96.95 GW, a figure at variance with government claims of having hit 100 GW. Typically, these differences are accounted for by […] Read more