Rajasthan Notifies Renewable Energy Policy: Solar Keeps Wind In Shadow Updated On Sat, Oct 7th, 2023 by Saurenergy This week has turned out to be an eventful when it comes to the renewable energy policy landscape with the two leading states in capacity additions- Gujarat and Rajasthan unveiling their Renewable Energy Policies. Ambitions The policy newly unveiled policy strives for 90 GW of solar capacity in the state by decade-end. It also eyes […] Read more
Rooftop, CPP & Hybrid Projects Take Precedence in Gujarat Renewable Energy Policy 2023 Updated On Thu, Oct 5th, 2023 by Saurenergy Gujarat Chief Minister Bhupendra Patel has released the Gujarat Renewable Energy Policy 2023. The Policy, whose operative period is upto 2028 or till notification of new policy (whichever is earlier), sets sights on achieving some big goals defined by the State and places a premium on solar-wind hybrid projects. Goals Chalked Out The State will […] Read more
Tale Of Two Solar Trailblazers-Greenlab Diamonds & Muni Seva Ashram Updated On Thu, Sep 28th, 2023 by Saurenergy Greenlab Diamonds and Muni Seva Ashram are two different entities working in entirely different sectors. While Surat-based Greenlab Diamonds is a company dealing with lab-grown diamonds, Muni Seva Ashram is an institution at Goraj in Vadodara, hosting a hospital, school and social institutions. However, both these Gujarat-based institutions have one thing in common-adoption of green […] Read more
Solar Power Costs Dipped 87% Globally In Last 10 Years: Study Updated On Tue, Sep 26th, 2023 by Saurenergy A recent report by the Mercator Research Institute on Global Commons and Climate Change claimed that the cost of electricity from solar power globally has fallen by 87 percent in the last 10 years. At the same time, the cost of battery storage plummeted by 85 percent during the same period. The recent innovation in […] Read more
KPI Green Energy Bags 145.20 MW Wind-Solar Project from Ayana Renewable Power Updated On Mon, Sep 25th, 2023 by Saurenergy Independent Power Producer (IPP) KPI Green Energy Limited has been awarded a Letter of Intent (LOI) for a 145.20 MW wind-solar hybrid power project (comprising 145.20 MW wind and 50 MW solar) by Ayana Renewable Power Four Private Limited, based in Bangalore. The project is scheduled to be completed in the financial year 2024-25. The […] Read more
Suzlon Bags 29.4 MW Wind Power Order from BrightNight Updated On Fri, Sep 22nd, 2023 by Saurenergy Suzlon Group, a renewable energy solutions provider, has announced a new order win for the development of a 29.4 MW of wind installed capacity for 100 MW co‐located wind‐solar hybrid project of BrightNight, a global renewable power producer. Suzlon will install 14 units of their S120-140m wind turbine generators (WTGs) with a Hybrid Lattice Tubular […] Read more
SJVN Invites Developers to Bid for 1500 MW ISTS-Connected Wind-Solar Projects Updated On Thu, Sep 21st, 2023 by Saurenergy SJVN has issued a tender inviting bids from developers to establish 1500 MW ISTS-connected (Inter-State Transmission System) wind-solar hybrid projects in India. The last day to submit the bid is November 7, 2023. Bids open on November 8, 2023. The validity of the bid is 12 months from the last date of bid submission. SJVN […] Read more
GIPCL Invites Bids for Contractors to Supply Solar Modules for 600 MW PV Project Updated On Tue, Sep 19th, 2023 by Saurenergy Gujarat Industries Power Company Limited (GIPCL) has issued a tender for bidding and selection process of a contractor for manufacturing, testing, supply, packing and forwarding, handling (up to receipt at site) insurance and transportation of Solar PV Modules (bifacial technology) with minimum module capacity of 540Wp and maximum module capacity of 570Wp for 600 MW […] Read more
SECI’s Hybrid Projects Set To Offer Green Power At Rs 2.53/Unit Updated On Thu, Sep 14th, 2023 by Saurenergy India is all set to get renewable power from upcoming 1,170 MW solar-hybrid projects at Rs 2.53 per unit. These Inter-State Transmission System (ISTS) projects are situated in states like Rajasthan, Karnataka and Gujarat. These projects are set to be commissioned by next year. These projects were part of the Solar Energy Corporation of India […] Read more