India Should Double Down on Renewable to Achieve Energy Targets 2030: Study Updated On Wed, Mar 24th, 2021 by Saurenergy India should double down on renewables to achieve its aggressive renewable energy targets in India’s electricity grid in 2030, according to a recent study by the researchers at UC Santa Barbara. The study analyzes electricity and carbon reduction costs linked with India’s energy targets in the electricity grid in 2030 and discovers that the majority […] Read more
Only 18% of Announced Recovery Spending can be Considered ‘Green’: Report Updated On Thu, Mar 11th, 2021 by Saurenergy An analysis of spending by leading economies has found that only 18 percent of announced recovery spending can be considered ‘green.’ One year from the onset of the pandemic, recovery spending has fallen short of nations’ commitments to build back more sustainably. An analysis of spending by leading economies, led by Oxford’s Economic Recovery Project […] Read more
US DOE Announces $115 Mn to Small Businesses for Clean Energy R&D Projects Updated On Mon, Mar 8th, 2021 by Saurenergy In support of the Biden-Harris Administration’s commitment to build the American economy back better, the US Department of Energy (DOE) has announced USD 115 million for small businesses pursuing clean energy research and development (R&D) projects. The projects range from grid modernisation and carbon removal to renewable energy and energy storage. “Through this program, DOE […] Read more
Average Rural Power Supply Duration has Increased to 18.5 Hours Updated On Fri, Mar 5th, 2021 by Saurenergy RK Singh has informed that the average rural power supply duration increased from 12.5 hours in 2014-15 to 18.5 hours in 2019-20. Addressing the Power Ministry Parliamentary Consultative Committee in a meeting, Power Minister RK Singh has informed that the average rural power supply duration increased from 12.5 hours in 2014-15 to 18.5 hours in […] Read more
Karnataka Issues Renewable Energy Policy 2021-26, Targets 20 GW of RE Projects Updated On Fri, Mar 5th, 2021 by Saurenergy Karnataka Renewable Energy Development Limited (KREDL) has drafted the “Karnataka Renewable Energy Policy 2021-26” to strengthen the Renewable Energy markets in the state. Being one of the leading States in Renewable Energy (RE) sector in the country with a RE generation capacity of about 15,037 MW, the KREDL has drafted the policy with a foremost […] Read more
Ford to go All-Electric by 2030, all Vehicles to go Electric in Europe Updated On Thu, Feb 18th, 2021 by Saurenergy Ford Motor Company has announced it is taking a significant step forward in its European transformation with a commitment to go all-in on its electric passenger vehicles and to substantially grow and electrify its leading commercial vehicle business. Ford says by mid-2026, 100 percent of its passenger vehicle range in Europe will be zero-emissions capable, […] Read more
Rajasthan to Focus On Renewable Energy Projects for Special Package Under IPS Updated On Thu, Feb 11th, 2021 by Saurenergy In a meeting held under the chairmanship of Chief Secretary Niranjan Arya, six renewable energy projects in Rajasthan have been recommended for consideration of a special package under the state’s investment promotion scheme (IPS). According to the sources from meeting, the proposals are from varied sectors like energy, textile, and manufacturing assuring to generate over […] Read more
1 in 6 Passenger Cars Registered in EU in Q4 was Electrically-Chargeable Updated On Fri, Feb 5th, 2021 by Saurenergy In Q4 2020, nearly one in six passenger cars registered in the European Union (EU) was an electrically-chargeable vehicle (16.5 percent). In the fourth quarter (Q4) of 2020, nearly one in six passenger cars registered in the European Union (EU) was an electrically-chargeable vehicle (16.5 percent). Stimulus packages introduced by governments to boost demand, following […] Read more
Adani Green Energy Added 700 MW to Operational Capacity in YTD FY21 Updated On Thu, Feb 4th, 2021 by Saurenergy Adani Green Energy Ltd (AGEL), a part of the Adani Group, has announced the financial results for the financial period ended December 31, 2020. The firm has reported that continuing on its rapid capacity building despite the ongoing pandemic, it added 700 MW to its operational capacity in YTD FY21 with commissioning of 475 MW […] Read more