SUBSCRIBE NEWS LETTER

Wind Power Projects

NLC India, Adyant Secure SJVN Wind Project

NLC India Limited (NLCIL), a Navratna company under the Ministry of Coal, Government of India, received a Letter of Award (LoA) for a 200 MW Wind Power Project from SJVN Limited at a tariff of Rs. 3.74/kWh. Meanwhile, Adyant Enersol secured a 112 MW wind project at a tariff rate of Rs. 3.81/kWh. NLC India […]

Read more

JSW Energy Adds 159 MW Wind Power, Total Capacity At 2.8 GW

Mumbai-based JSW Energy has added 159 MW of new wind power capacity this quarter, bringing its total operational capacity to 8,400 MW. This expansion comes ahead of the wind season and can help meet the rising energy demand during the upcoming peak period.  Following this addition, the company’s total operational wind capacity now stands at […]

Read more

Hindustan Power, Tata & Adani Commit Investments In Assam’s Power Sector

Marking a major step in Assam’s renewable energy sector, companies like Adani Group, Tata Power, and Oriana Power have announced investments in the state for the coming year. For instance, Ratul Puri’s Hindustan Power has signed a Memorandum of Understanding (MoU) with the Assam government to invest ₹620 crore in battery energy storage projects. The […]

Read more

Global Offshore Wind Auctions Set To Fall In 2025, After 2024 Surge, Finds Study

The global offshore wind industry is poised for a rebound in 2025, with capacity additions expected to reach 19 gigawatts (GW) and sector-wide expenditure projected to hit $80 billion, according to research from Rystad Energy. This recovery follows a slowdown at the end of last year, when new installations dropped to approximately 8 GW — […]

Read more

CERC Adopts Tariff For SECI’s 1.2 GW Hybrid Power Projects (Tranche VI)

The Central Electricity Regulatory Commission (CERC) has adopted the tariff for 1,200 MW Wind-Solar Hybrid Power Projects with Assured Peak Power Supply (Tranche VI) under the competitive bidding process conducted by the Solar Energy Corporation of India Limited (SECI). It is pertinent to note that SECI had filed a petition before CERC under section 63 […]

Read more

NTPC REL Issues 900 MW Wind Energy Tender At Andhra Pradesh With BoS Package

NTPC Renewable Energy (NTPC REL), a subsidiary of NTPC, has issued a tender for the Balance of System (BoS) package of an ISTS-connected wind energy project with a nominal capacity of 900 MW at Anantapur in Andhra Pradesh. It is accepting bids until April 3, 2025. NTPC REL, in its brief scope of work, mentions […]

Read more

ACME Solar To Focus On FDRE, Hybrid Projects, Invest Rs 17k cr

ACME Solar Holdings plans to invest Rs 17,000 crore to boost renewable energy capacity to 5 GigaWatts (GW) by 2026, the top management of the company told journalists. In an interaction with reporters, Nikhil Dhingra, CEO of ACME Solar discussed its future roadmap. The company, which was till now confined to vanilla solar projects and […]

Read more

Low Tariffs, Land Issues Limit Wind Auctions to 5.2 GW in FY23-25: CRISIL

India’s annual wind power capacity addition will more than double to 7.1 GW on average in the next two fiscal years, compared with 3.4 GW in fiscal 2023-25. This can take the installed wind capacity up to ~63 GW by fiscal 2027, according to CRISIL research. However, capacity additions over fiscal years 2023-25 continued to […]

Read more

India Adds 35 GW Power in 2024, Solar Leads with 71% Share: Study

India added nearly 35 gigawatts (GW) of power capacity in 2024, setting a new record for the calendar year. According to the GEM study,  Solar photovoltaic (PV) capacity made up almost 25 GW (71%) of all additions across the power sector, a record annual capacity addition for any technology in India. Despite the strong year, […]

Read more
      SUBSCRIBE NEWS LETTER
Scroll