Total Eren, Inaccess Ink Solar Monitoring Agreement Updated On Tue, Oct 5th, 2021 by Saurenergy London-based Inaccess has signed a global framework contract with Paris-based Total Eren for the support and maintenance of unity monitoring, SCADA (supervisory control and data acquisition) and PPC (power plant control) system for several Total Eren’s solar plants located in Argentina, Australia, Brazil, and Kazakhstan. The unity system optimizes the operation of modern renewable power portfolios […] Read more
Turbine Maker Senvion Bags 591 MW Order from JSW Energy Updated On Mon, Oct 4th, 2021 by Saurenergy Wind turbine maker Senvion has been awarded a 591 MW project by JSW Energy. Senvion turbines will be deployed in JSW Energy’s ongoing pipeline of ~ 2.5 GW of renewable projects which are under construction. Senvion India, owned by Saudi Infrastructure major Alfanar group, has been a key player in India’s wind equipment market. The […] Read more
NTPC Green Arm Signs First Green Term Loan Worth 500 Cr Updated On Thu, Sep 30th, 2021 by Saurenergy NTPC Renewable Energy ltd (REL), a 100 per cent subsidiary of NTPC ltd, has signed its first green term loan agreement of Rs. 500 crores at a very competitive rate with a tenor of 15 years with Bank of India on September 29, 2021, for its 470 MW solar projects in Rajasthan & 200 MW […] Read more
McDermott Joins AquaVentus Consortium for Green H2 Production Updated On Thu, Sep 30th, 2021 by Saurenergy Texas-based McDermott has joined AquaVentus, a growing consortium of more than 70 companies, organizations and research institutions collaborating toward green hydrogen energy production in the North Sea. AquaVentus unites international industry leaders with a shared vision for advancing hydrogen’s role as a low-carbon, affordable energy solution-combining their unique expertise to make that future a reality. […] Read more
63% of Planned Battery Storage in US to Be Co-Located With Solar Updated On Thu, Sep 30th, 2021 by Saurenergy Of the 14.5 gigawatts (GW) of battery storage power capacity planned to come online in the United States from 2021 to 2024, 9.4 GW (63%) will be co-located with a solar photovoltaic (PV) power plant, based on data reported to us and published in the Annual Electric Generator Report. Another 1.3 GW of battery storage […] Read more
Assistant Lead Engineer Updated On Tue, Sep 28th, 2021 by Saurenergy C& E Quality & Tools is part of Converter & Electrical Module in ACE module unit in Vestas Power Solutions (Vestas R&D). Vestas Power Solution is a business unit where new product ideas are developed, matured, improved, maintained, and tested. Vestas Power Solutions operates on a global scale with more than 1,300 employees. The TCM […] Read more
NHPC Board Approves Setting up Subsidiary for RE Business Updated On Tue, Sep 28th, 2021 by Saurenergy State-owned hydro power giant NHPC on Friday said its board has approved the proposal to form a subsidiary for the development of renewable energy, small hydro and green hydrogen projects. “Board of Directors of Company in its meeting held today i.e. Friday, September 24, 2021 inter-alia has considered and approved the proposal regarding the formation […] Read more
Bord na Mona to Build ‘1st Irish Dedicated RE Business Park’ Updated On Tue, Sep 28th, 2021 by Saurenergy Irish utility service provider Bord na Mona (BnM) is planing to construct a 200MW-plus hybrid energy park — the “first Irish dedicated renewable-energy business park.” The semi-state company said that the so-called energy park will be developed on more than 7,400 acres of its landbank in counties Meath, Offaly and Westmeath. It is expected to potentially […] Read more
Chennai Central Turns Solar Central Updated On Mon, Sep 27th, 2021 by Saurenergy The Puratchi Thalaivar Dr. M.G. Ramachandran Central or Chennai Central railway station, under the South Central Railway (SCR), has met the 100% day energy requirement target by solar panels installed on the platform shelters of the station. Informing about the same, Union railway minister Ashwini Vaishnaw tweeted, “100% Day energy requirement of Chennai Central Station […] Read more