Solar PLI Tender Gets Massive Response, Close to 55 GW Worth Bids Submitted Updated On Wed, Sep 22nd, 2021 by Saurenergy The Solar PLI tender, (Production Linked Incentive) where IREDA is the implementing agency, has received a massive response from bidders, with just 9 bidders going for 4 GW capacity creation each. Another 9 bidders make up the remaining bids for 18,809 MW of capacity building. (View Scheme Details Here) The PLI Scheme has divided an […] Read more
Bengal Tender for Empanelment Of Rooftop Agencies for 50 MW Solar On Residential Buildings Updated On Fri, Aug 27th, 2021 by Saurenergy The West Bengal State Electricity Distribution Company Limited (WBSEDCL) is seeking bids for the empanelment of agencies for the installation of 50 MW of grid-connected rooftop solar projects on residential buildings in West Bengal. The tender comes after a significant gap, with Bengal already one of the laggards on solar adoption. In fact, the state […] Read more
IPO Time For India Solar Equipment Manufacturers In 2021 Updated On Mon, Aug 9th, 2021 by Saurenergy After a long wait, initial reports are finally coming out regarding plans by major Indian solar equipment manufacturers planning Initial Public Offers. We refer to a long wait simply because the markets have been buoyant for a while now, and have duly been followed by an IPO wave the likes of which has rarely been […] Read more
First Solar Signs Up For Make in India With 3.3 GW Manufacturing facility in India Updated On Fri, Jul 30th, 2021 by Saurenergy First Solar, Inc. (Nasdaq: FSLR) today announced that it intends to invest $684 million in a new, fully vertically-integrated photovoltaic (PV) thin film solar module manufacturing facility in India. Contingent upon permitting, and pending approval of Indian government incentives that are satisfactory to First Solar, the advanced facility is expected to commence operations in the second […] Read more
Saatvik Green Energy Wins BHEL’s 141.76 MW Solar Modules Order Updated On Wed, Jun 30th, 2021 by Saurenergy Indian module manufacturers, Saatvik Green Energy Pvt. Ltd. has won a 141.76 MW Solar modules tender from Bharat Heavy Electricals Limited (BHEL). BHEL floated the tender for their 100 MWac Gujarat State Electricity Corporation Ltd (GSECL) Raghanesda Ultra Mega solar park in Gujarat. Saatvik Green Energy secured the bid in a reverse bidding auction while […] Read more
Keventer Agro Claims Strong Performance For Its Rooftop Solar Plant Updated On Mon, Jun 7th, 2021 by Saurenergy Kolkata based food and dairy major, Keventer Agro, which retails premium dairy products, reports a strong performance from its rooftop solar plant, one of the largest in East India. The 2.15 MW plant was built over an area of over 2 lakh square feet at the firm’s plant in Barasat. The plant EPC was done […] Read more
UP Women Make Solar Lamps for Kids Facing Power Cuts in Rural Parts Updated On Wed, May 19th, 2021 by Saurenergy In our country, rural areas suffer the most because of power cuts. Activities which require a regular flow of electricity, such as studying or cooking indoors, especially at night, are plagued by disruptions. A little relief from such problems has arrived as the Uttar Pradesh Government has launched a project to manufacture and distribute solar […] Read more
Another Deadline for OE Services Related to Solar & Storage Project in Chhattisgarh Updated On Fri, May 14th, 2021 by Saurenergy The Solar Energy Corporation of India (SECI) has extended the bid submission deadline for the selection of consultancy firms for Owners Engineer (OE) services for the 100 MW (AC) solar PV project (160 MWp DC capacity) along with 40 MW/120 MWh Battery Energy Storage System (BESS) at district Rajnandgaon, Chhattisgarh during the design, construction, commissioning and preparations […] Read more
Guidelines Issued for PLI Scheme for Solar Modules; IREDA to be Implementing Agency Updated On Mon, May 3rd, 2021 by Saurenergy MNRE has issued the guidelines for the implementation of the PLI scheme for high-efficiency solar PV modules. The Ministry of New and Renewable Energy (MNRE) in a ministry wide notification has announced the sanction of the President for implementation of the Production Linked Incentive (PLI) scheme ‘National Programme on High-Efficiency Solar PV Modules’ for achieving […] Read more