RVUNL Invites Bids for 810 MW STU Connected Solar Tender for RVUN Park, Bikaner Updated On Tue, Dec 27th, 2022 by Saurenergy To establish 810 MW of state transmission utility-connected solar power projects in RVUNL’s Ultra Mega Solar Park in Bikaner, Rajasthan Rajya Vidyut Utpadan Nigam (RVUNL) has requested bids from solar project developers. These projects will be built-own-operate projects. November saw the release of the tender, however, it was quickly withdrawn. The bids must be submitted […] Read more
Senior Mechanical Engineer – Pump Specialist Updated On Mon, Dec 26th, 2022 by Saurenergy Have in-depth knowledge in the design of pumps, used in mines, minerals handling and processing plants, infrastructure, oil & gas, Chemical projects. Have hands on knowledge on pump sizing and selection, line size and pressure drop calculation, selecting the design pressure and design temperature of the pumping system and components as per codes and standards. […] Read more
Manager- Manufacturing Finance Updated On Mon, Dec 26th, 2022 by Saurenergy A Manager of Manufacturing Finance provides financial leadership to manufacturing site, collaborates with multiple disciplines, and provides analytical insight to site leadership. The role further supports a range of value-added insights including short term financial planning, ad hoc financial analysis, forecasting, budgeting, management and KPI reporting. The role requires effective business partnering on initiatives to drive lower cost […] Read more
Supervisor- Manufacturing I Updated On Mon, Dec 26th, 2022 by Saurenergy Supervises the daily production of Photovoltaic modules in accordance with required quality standards and in a cost efficient manner. Essential Functions & Responsibilities:- Adheres to all safety procedures and good housekeeping standards, including our 5S system Directly supervises the daily production of Photovoltaic modules in accordance with required quality standards and in a cost efficient […] Read more
DWSS Floats 8.7 MW of Solar Tender to Power Water Supply Systems in Punjab Updated On Fri, Dec 23rd, 2022 by Saurenergy State-owned Department of Water Supply and Sanitation (DWSS) has invited bids to install 8.7 MW capacity solar projects at 970 rural piped water supply systems in Punjab. The last date for submitting the bid for this DWSS solar tender is January 12, 2023, and the bid will be opened on January 13, 2023. The scope […] Read more
Scientific/Technical & Support Staff Updated On Wed, Dec 21st, 2022 by Saurenergy National Institute of Solar Energy (NISE) is an Autonomous Institute of Ministry of New and Renewable Energy, Government of India to function as an apex national centre for Research and Technology Development in the areas of Solar Energy. NISE is located on a 200 Acre campus on the Gurugram- Faridabad Road, Gwal-Pahari, Gurugram (Haryana). The […] Read more
ADB Arranges $107 Million for BIM Group to Support Wind Project in Vietnam Updated On Wed, Dec 21st, 2022 by Saurenergy The Asian Development Bank (ADB) has signed a financial package of $107 million with BIM Wind Power Joint Stock Company (JSC) to support the operation of an 88 MW wind energy farm located in Ninh Thuan province of Vietnam. The wind project lies to the south-central coast of the South East Asian country. BIM Wind […] Read more
Director General Updated On Wed, Dec 21st, 2022 by Saurenergy National Institute of Solar Energy (NISE) is an autonomous institute (registered under Societies Registration Act 1860) under the administrative control of the Ministry of New & Renewable Energy (MNRE). NISE is having its Headquarters at Gurugram (Haryana). The Institute is an apex National R&D Institute in the field of Solar Energy and undertakes activities related […] Read more
Design Engineer – Solid Waste Management Updated On Fri, Dec 16th, 2022 by Saurenergy Responsibilities:- identify the industrial waste and MSW infrastructure gaps, review of exclusionary screening/ prioritization of subprojects (including for any updation in investment plan and action plan, and any phasing of deliverables on iterative basis during PRF implementation), proof of concept/ site plans, development of key indicators, etc., prior to undertaking detailed engineering design stage of […] Read more