Top 12 Trends Of 2023 That Created Ripples In Indian Renewable Sector Updated On Tue, Jan 2nd, 2024 by Saurenergy For India, forming a backdrop to the whole year was the softening in global module prices, continuation of ALMM exemptions, and of course, the noise around carbon credits and green hydrogen. Which events actually made an impact? Which ones stood out and are most likely to make a real impact, and soon? We present below […] Read more
Suzlon Secures 300 MW Order For Its 3 MW Turbines From Apraava Energy Updated On Thu, Dec 28th, 2023 by Saurenergy Indian Wind Energy company Suzlon Group today announced a new order win for the development of a 300 MW wind power project for Apraava Energy Private Limited. Suzlon will install 100 wind turbine generators (WTGs) with a Hybrid Lattice Tubular (HLT) tower and a rated capacity of 3 MW each at the client’s site in […] Read more
43 Pumped Hydro Storage Projects With 55 GW Capacity Under Survey: Govt Updated On Wed, Dec 27th, 2023 by Saurenergy Union Power Minister R.K Singh in a written reply before the Parliament stated that a total of 43 Pumped Hydro Storage Projects (PSPs) are under survey and investigation in the country. He mentioned that these projects have an aggregate installed capacity of 55,085 MW. The minister also said that a total of four PSPs are […] Read more
JSW Energy Initiates Commissioning of SECI-IX Wind Project of 810 MW Updated On Wed, Dec 27th, 2023 by Saurenergy JSW Renew Energy Limited, a subsidiary, of JSW Energy Limited has started phase-wise commissioning of the 810 MW ISTS-connected wind power project. This project was awarded under SECI tranche IX in Tamil Nadu with commissioning of the first phase of 51 MW. The project has a power purchase agreement with Solar Energy Corporation of India […] Read more
Engineer- Development IV Updated On Tue, Dec 26th, 2023 by Saurenergy Perform material and device research to enhance thin film solar cell performance and stability and to reduce manufacturing cost. Responsible for projects or functions that are highly complex, require significant innovation and critical to department objectives. Plan, execute and characterize development engineering experiments in the laboratory and manufacturing environment with strategic foresight. Success requires iterative […] Read more
UP Continues To Host Largest EV Share In India, Govt Tells Parliament Updated On Thu, Dec 21st, 2023 by Saurenergy Minister of State (MoS) of Heavy Industries of India, Krishan Pal Gurjar recently told the Lok Sabha that Uttar Pradesh (UP) continued to host the highest number of electric vehicles (EVs) in the country. This came to the fore when the minister furnished the state-wise list of sales of EVs across India. As per the […] Read more
Maharashtra Leads In Providing Incentive Under The Rooftop Solar Program In 2023 Updated On Wed, Dec 20th, 2023 by Saurenergy The Union Minister for New & Renewable Energy and Power (MNRE) informed the parliament in a written reply to the renewable energy capacity in the country has increased by about 2.35 times in the last decade. Among other details, the minister gives a state-wise detail of subsidies provided under various schemes to encourage new and […] Read more
Tata Power Solar Systems in Contract with NTPC for 152 MWp Domestic Content Requirement PV Modules Updated On Mon, Dec 18th, 2023 by Saurenergy Tata Power Solar Systems Limited (TPSSL), a wholly owned subsidiary of Tata Power Renewable Energy Limited (TPREL) has signed a contract to supply 152 MWp DCR (Domestic Content Requirement) solar PV modules for NTPC Limited (NTPC’s) Nokh Solar PV Project in Rajasthan. The project holds a significant order value of approximately INR 418 crore. NTPC […] Read more
PM KUSUM: Ambitions Continue to Overpower Ground Work in 2023 Updated On Fri, Dec 15th, 2023 by Saurenergy The Union Minister for New & Renewable Energy and Power R.K. Singh has informed that 2.73 lakh standalone solar pumps have been installed under PM-KUSUM as on October 31, 2023. Not surprisingly, Component A has barely seen installations, with Component C being disappointing. Component B has fared better relatively. Component A Installations Fail to Impress […] Read more