Nine Developers Pitch In For SECI’s 1.2 GW ISTS Wind Tender Updated On Fri, Feb 8th, 2019 by Saurenergy SECI’s Tranche 6 Wind Energy Tender, for 1.2 GW, saw a return to happy days again, as a total of nine developers made bids totaling 2325 MW for the 1200 MW tender. Softbank promoted SB Energy made the biggest bid for 600 MW, followed by ReNew Power, EDF, and ENEL who bid for 300 MW […] Read more
4000 MW of Wind Projects Stay Stranded in Gujarat deadlock Updated On Wed, Feb 6th, 2019 by Saurenergy A Strange game of non cooperation and poor coordination in Gujarat has trapped projects worth 4000 MW in red tape. Media had reported in December 2018 about, the Gujarat government’s intransigence regarding projects allotted before its new land policy for wind projects comes up. The policy, which was announced in July 2018, has led to […] Read more
Tender for Geo-Technical Study of 500 MW Kadaladi Solar Park to Close on Jan 31 Updated On Wed, Jan 30th, 2019 by Saurenergy The last date for bid-submissions is January 31, 2019. And the bids will open on the same day I.e. January 31, 2019. The Tamil Nadu Generation and Distribution Corporation (TANGEDCO) has issued a tender for conducting geotechnical testing for the establishment of its 500 MW Kadaladi Solar Park in the Ramanathapuram District of Tamil Nadu. […] Read more
Viz-A-Viz with Ashit Maru, Co-founder, MYSUN Updated On Wed, Jan 30th, 2019 by Saurenergy Quality Manufacturing and Easy Financing Needs Serious Attention Local manufacturing and the quality standards of local make has to be addressed and scaled-up as well, if we are to see any major boost as a manufacturing hub for rooftop solar. Quality manufacturing and easy financing are the two factors that have to be taken very […] Read more
Bids for 8 GW Wind Power Finalised: RK Singh Updated On Fri, Dec 28th, 2018 by Saurenergy As on date, the bids for setting up of wind power projects of aggregate 8389.90 MW capacity have been finalized through SECI and NTPC. Taking giant leaps in the renewable energy secto0072, bids for setting up of wind power projects of aggregate 8389.90 MW capacity have been finalised through Solar Energy Corporation of India (SECI) […] Read more
NCLT Allows Demerger of Emami’s Power and Cement Business Updated On Thu, Dec 27th, 2018 by Saurenergy In the petition filed with NCLT, Emami pegged that the demerger will bring strength to each business with a focused and individual attention. National Company Law Tribunal’s Kolkata bench has recently approved the demerger of Emami’s solar power business, Emami Power, from its cement business, Emami Cement Limited. A petition was filed by the Indian […] Read more
Bids for setting up of Wind Power Projects of over 8000 MW Capacity Finalised Updated On Thu, Dec 27th, 2018 by Saurenergy The wind power projects in the country are installed on the basis of commercial viability through tariff based competitive bidding process. As on date, the bids for setting up of wind power projects of aggregate 8389.90 MW capacity have been finalised through Solar Energy Corporation of India Ltd. (SECI) and National Thermal Power Corporation Ltd. […] Read more
3,217 Million US$ received as FDI in Renewable Energy Sector Updated On Thu, Dec 27th, 2018 by Saurenergy Renewable Energy Capacity reaches about 74GW as on 30/11/2018 The FDI data cell of the Department of Industrial Policy and Promotion (DIPP) compiles and maintains the data of Foreign Direct Investment (FDI) Equity inflow received in the country. The FDI equity inflow from April, 2015 to June, 2018 in the Non-Conventional Energy Sector is as […] Read more
Wind Power Developers up in Arms with TNERC Over Tariff Updated On Mon, Dec 24th, 2018 by Saurenergy Following that, TNERC approved a wind power auction of 1500 MW, in 3 trenches of 500 MW each, proposed by the Tamil Nadu Generation and Distribution Co. Developers of wind energy in Tamil Nadu are locking horns with the Tamil Nadu Electricity Regulatory Authority (TNERC) over the ceiling tariff approved by the authority which even […] Read more