ALMM: India’s Enlisted Solar Module Manufacturing Capacity Touches 41.5 GW Updated On Wed, Apr 10th, 2024 by Saurenergy The latest updated Approved List of Models and Manufacturers (ALMM) list released by the Ministry of New and Renewable Energy (MNRE) reported a rise in domestic solar module manufacturing capacity. As per the latest ALMM list, released by the MNRE, the total enlisted solar module manufacturing capacity in India touched 41,463 MW. The latest list […] Read more
SGEL, APDCL Sign Agreement To Develop RE Projects In Assam Updated On Tue, Apr 9th, 2024 by Saurenergy SJVN Green Energy Ltd (SGEL), a wholly owned subsidiary of the company SJVN Green Energy Limited (SGEL) signed a joint venture cum shareholders agreement with Assam Power Distribution Company Limited (APDCL). The agreement covers the development of renewable energy projects/parks within the APDCL / SGEL or SJVN command area. This project is to be undertaken […] Read more
FIMER’s Made In India Inverters Shine In Key Indian PV Projects: KN Sreevatsa, MD Updated On Tue, Apr 9th, 2024 by Saurenergy 1.How was the year 2023 for FIMER in India In 2023, FIMER achieved a groundbreaking feat by securing its first major order of the year — a substantial 2.45 GW contract from a single client at a specific location in India. This was particularly significant as it involved the successful conclusion of the NTPC Phase […] Read more
West Bengal Thermal Power Plant To Produce Solar From Multiple Sources Updated On Tue, Apr 9th, 2024 by Saurenergy West Bengal-based Sagardighi Thermal Power Plant (TPP) is now all set to produce solar power from different sources to send it to the local grid. The TPP situated at Murshidabad has established a 10 MW grid-connected ground-mounted solar plant and a 5 MW grid-connected floating solar plant for the same. The power plant has now […] Read more
Solar Performance Lead Updated On Mon, Apr 8th, 2024 by Saurenergy Responsible for data analysis and initial preparation of deliverables to contribute to the completion of an engagement. Works with limited to moderate supervision and/or may lead a small effort or project team. Key Responsibilities:- Consulting Capability:- Ensures individual contributions are aligned with client needs and consistent with overall engagement objectives Understands and consistently meets client […] Read more
Vikram Solar Appoints Narayan Lodha As Chief Financial Officer Updated On Mon, Apr 8th, 2024 by Saurenergy Vikram Solar, an Indian solar module manufacturer today announced an addition to its leadership team. The company announced the appointment of Narayan Lodha as its Chief Financial Officer. “Lodha’s appointment is a testament to our strategic vision for scaling operations and pioneering state-of-the-art solutions in both established and emerging markets, particularly in the field of […] Read more
As Govt Reimposes ALMM, New Challenges Emerge For Solar Industry Updated On Mon, Apr 8th, 2024 by Saurenergy Approved List of Module Manufacturers (ALMM) reimposition in India by the Ministry of New and Renewable Energy (MNRE) has led to speculations in the solar industry ranging from solar module manufacturers, and developers to other stakeholders. The ministry had earlier kept it in abysence for a few years to allow the domestic solar market to […] Read more
Vietnam Favoured By Chinese Solar Firms- 14 GW MoU For Solar Panels Signed In Latest Deal Updated On Mon, Apr 8th, 2024 by Saurenergy In a clear indication of the advantage it offers versus other South East Asian nations for Chinese firms, Vietnam saw the signing of yet another Memorandum of Understanding (MoU) for a 14 GW solar panel project, to be built in two phases. Signed between Hoang Thinh Dat JSC and Chinese firm Hainan Drinda New Energy […] Read more
News In Brief April 5- Alpex Solar, SolarEdge, Ford & More.. Updated On Fri, Apr 5th, 2024 by Saurenergy Alpex Solar bags govt orders worth Rs. 11.90 crore in Jharkhand under the PM-KUSUM scheme Alpex Solar says it has received orders for supply, installation and commissioning of 500 Solar Water Pumping Systems from Jharkhand Renewable Energy Development Agency. The Projects are scheduled to be completed within 120 days from the date of issue of work […] Read more