QUERIES OF PRE-BID MEETING : SELECTION OF SOLAR POWER DEVELOPERS FOR SETTING UP OF 150MW (50MW X 3) GRID CONNECTED FLOATING SOLAR POWER PROJECTS TO BE INSTALLED AT RIHAND DAM, UP Updated On Tue, May 15th, 2018 by Saurenergy This has reference to the RfS No. SECI/C&P/SPD/RfS/150MW FLOATING/UP/032018 dated 17.04.2018 regarding “Selection of Solar Power Developers for Setting up of 150MW (50MW x 3) Grid Connected Floating Solar Power Projects to be installed at Rihand Dam (also known as Govind Ballabh Pant Sagar Reservoir), Sonbhadra District, Uttar Pradesh”. The pre-bid meeting for the subject […] Read more
Govt Brings National Policy for Wind-Solar PV Hybrid Projects Updated On Tue, May 15th, 2018 by Saurenergy A scheme for new hybrid projects under the policy is also expected shortly. The government has issued a new national wind-solar hybrid policy aiming to provide framework for promotion of large grid connected wind-solar PV hybrid system for efficient utilization of transmission infrastructure and land. The Ministry of New and Renewable Energy (MNRE) also said […] Read more
IMPORTANT: PRE-BID MEETING FOR RFS FOR 750 MW SOLAR PV PROJECTS IN KADAPA SOLAR PARK, ANDHRA PRADESH Updated On Mon, May 14th, 2018 by Saurenergy With reference to the RfS for setting up of 750 MW Grid-connected Solar PV Projects in Kadapa Solar Park, Andhra Pradesh, the pre-bid meeting for the same has been scheduled as per the following details: Date: 17.05.2018 Time: 11.00 AM IST Venue: Solar Energy Corporation of India Ltd., 1st Floor, A-Wing, D-3, Prius Platinum Building, […] Read more
Solar Power Project Developers Urge MNRE to Defer Auctions Updated On Mon, May 14th, 2018 by Saurenergy The non-issuance of rules and regulation related to the Inter-State Transmission System (ISTS) and General Network Access has worried developers. It has also caused uncertainty over grid connectivity for the renewable projects in the country. The lingering issue of transmission has prompted solar project developers to urge Ministry of New and Renewable Energy (MNRE) to […] Read more
Karnataka Gets Three Solar PV Projects Through Rays Power Infra Updated On Fri, May 11th, 2018 by Saurenergy Open access model implemented in Karnataka enables access to power at considerably lower rates, offering better efficiencies and lower utility bills while reducing the carbon footprint of industries in the areas being serviced by projects built in the state. Under the state’s open access scheme and to add to its portfolio, Rajasthan-based utility company Rays […] Read more
POSTPONEMENT OF THE RFS UPLOADING : DEVELOPMENT OF 250MW (50MW X 5) GRID CONNECTED SOLAR PV PROJECT AT THE DONDAICHA SOLAR PARK (PHASE-I), DONDAICHA, DIST. DHULE, MAHARASHTRA Updated On Wed, May 9th, 2018 by Saurenergy This has reference to the NIT No. SECI/C&P/SPD/RfS/MAHAGENCO/042018 published dated 28.04.2018 regarding the RfS for Development of 250MW (50MW x 5) Grid Connected Solar PV Project at the Dondaicha Solar Park (Phase-I), Dondaicha, Dist. Dhule, Maharashtra. The RfS documents for the captioned NIT which was to be uploaded on 11.05.2018 by 1800 HRS has been […] Read more
SECI Invites Bids for Aggregating 3.37 GW Solar Power Projects across India Updated On Mon, Apr 30th, 2018 by Saurenergy The bunch of projects includes setting up of 2,000 MW (250 MW x 8) ISTS-connected solar power projects in India on build own operate basis. The Solar Energy Corporation of India (SECI) has invited proposals for selection of solar power developers for the installation of aggregating 3.375 GW solar PV projects on pan India basis. […] Read more
Canadian Solar Sells Brazil’s Guimarania Project to Global Power Generation Updated On Wed, Apr 18th, 2018 by Saurenergy The project, located in the state of Minas Gerais in Brazil, is under construction and expected to reach commercial operation in the fourth quarter of 2018. Solar PV modules maker Canadian Solar has sold its interest in the 80.6 MWp Guimarania solar energy project in Brazil to Spanish firm Gas Natural Fenosa’s arm Global Power Generation. The project, […] Read more
Extension of Bid submission date w.r.t. 200 MW Solar PV Projects in Pavagada Solar Park, Karnataka Updated On Tue, Apr 17th, 2018 by Saurenergy This has reference to the RfS Documents No. (SECI/NSM/P-2/B-4/RfS/KA/012018/SP) for selection of 200 MW Grid connected Solar PV Projects (4 projects) in Pavagada Solar Park, Karnataka. The last date of bid submission is hereby Extended till 30.04.2018(16:00 Hrs). All Prospective Bidders are requested to stay updated from TCIL website (www.tcil-india-electronictender.com) for more details. Read more