Solar Energy Sector Losing Sheen With Developers Shunning Projects Updated On Mon, Nov 19th, 2018 by Saurenergy Solar Energy Corporation of India (SECI) issued tenders for 1,200 megawatt (MW) of wind-solar hybrid scheme and 10,000 MW solar tender linked to manufacturing units Once touted as the sunrise sector, solar energy industry is losing is its sheen with developers showing reluctance towards bidding for projects. Solar Energy Corporation of India (SECI) issued tenders […] Read more
NTPC Invites Bids for 1200 MW Grid Connected Solar PV Projects Updated On Mon, Nov 12th, 2018 by Saurenergy The registration and downloading of RfS document will be available from November 13, 2018 to November 28, 2018. India’s largest energy conglomerate NTPC has floated bids for 1200 MW of Grid Connected Solar PV Projects with ISTS Connectivity through NTPC Generating Switchyards in Western Region under OPEN category. The company said in a notification that, […] Read more
Azure Power Wins 300 MW Solar Power Project with AAA Rated NTPC Updated On Thu, Nov 1st, 2018 by Saurenergy Azure Power, one of India’s leading independent solar power producers, announced that it has signed a letter of award (LOA) for a 300 MW Interstate Transmission System (ISTS) grid connected solar PV project won in an auction conducted by NTPC Limited, which has a domestic AAA debt rating and is the Government of India’s largest power […] Read more
Amendment 02 for Setting up of 02 mw Solar Power Project with 01 mwh BESS at Kaza, Himachal Pradesh Updated On Tue, Oct 30th, 2018 by Saurenergy This has reference to the RfS No. SECI/C&P/KAZA/042018 Dated 31.07.2018 for Setting up of 2 MW Solar PV power plant with 01 MW BESS at KAZA, HIMACHAL PRADESH. Tender for Design, Engineering, Supply, Construction, Erection, Testing, Commissioning including 5 Years Plant O&M of 2 MW (AC) Solar PV Power Plant with 01 MW BESS at KAZA, […] Read more
Extension 04 of Bid Submission of Setting up of 02 mw Solar Power Project with 01 mwh Bess at Kaza, Himachal Pradesh Updated On Sat, Oct 27th, 2018 by Saurenergy This has reference to the RfS No. SECI/C&P/KAZA/042018 Dated 31.07.2018 for Setting up of 2 MW Solar PV power plant with 01 MW BESS at KAA, HIMACHAL PRADESH. The last date of bid submission is hereby Extended till 12.11.2018 (14:00 Hrs). All Prospective Bidders are requested to stay updated from TCIL website (www.tcil-india-electronictender.com) for more details. Tender Search Code (TSC): SECI-2018-TN000026 Read more
Marathon Capital Sells OCI Solar Power’s 66MW Project Ivory to DESRI Updated On Tue, Oct 23rd, 2018 by Saurenergy The project, located in Dawson County, Texas, is anticipated to reach commercial operation in November 2018. One of the leading financial advisory and investment banking firm Marathon Capital has sold OCI Solar Power’s 66 MWDC in-construction solar photovoltaic project (Project Ivory) to D. E. Shaw Renewable Investments (DESRI). However, the company said that, OCI Solar Power funded the […] Read more
ReNew Power Wins 3MW Floating Solar PV Project at Visakhapatnam Updated On Mon, Oct 22nd, 2018 by Saurenergy In total, this project is estimated to generate around 4.2 million units of power annually, offsetting over 3,960 tonnes of carbon emissions every year. India’s one of the leading renewable energy IPP, ReNew Power has won the tender for developing a 3 MW floating solar PV project in Visakhapatnam, Andhra Pradesh. When commissioned, this project […] Read more
D. E. Shaw Renewable Investments Acquires Willow Springs Project from First Solar Updated On Thu, Oct 18th, 2018 by Saurenergy 100MWAC project adds to DESRI’s portfolio of PV assets First Solar, Inc. (Nasdaq: FSLR) and D. E. Shaw Renewable Investments, L.L.C. (DESRI) today announced the acquisition by a DESRI affiliate of the 100 Megawatt (MW)AC Willow Springs Solar Project in Kern County, California. Terms of the deal were not disclosed. The project, which was developed by First […] Read more
AMENDMENT-I, PPA & PSA : SELECTION OF SOLAR POWER DEVELOPERS FOR SETTING UP OF 150MW (50MW X 3) GRID CONNECTED FLOATING SOLAR POWER PROJECTS TO BE INSTALLED AT RIHAND DAM, UP Updated On Fri, Oct 12th, 2018 by Saurenergy This has reference to the RfS No. SECI/C&P/SPD/RfS/150MW FLOATING/UP/R1/092018 dated 06.09.2018 regarding “Selection of Solar Power Developers for Setting up of 150MW (50MW x 3) Grid Connected Floating Solar Power Projects to be installed at Rihand Dam (also known as Govind Ballabh Pant Sagar Reservoir), Sonbhadra District, Uttar Pradesh”. The pre-bid meeting for the subject tender has […] Read more