CCEA approves proposal for setting up 12,000 MW grid-connected Solar Photovoltaic (PV) Power Projects Updated On Wed, Feb 6th, 2019 by Saurenergy The Cabinet Committee on Economic Affairs (CCEA), chaired by Prime Minister, Shri Narendra Modi, has approved the Ministry of New & Renewable Energy’s proposal for implementation of the Central Public Sector Undertaking (CPSU) Scheme Phase-llfor setting up 12,000 MW grid-connected Solar Photovoltaic (PV) Power Projects, by the Government Producers with Viability Gap Funding (VGF) support […] Read more
DEWA and Siemens Begin Development of Solar-Powered Hydrogen Project Updated On Tue, Feb 5th, 2019 by Saurenergy The facility is being built at DEWA’s outdoor testing facilities in the R&D Centre at the Mohammed bin Rashid Al Maktoum Solar Park in Dubai. The Dubai Electricity and Water Authority (DEWA), Expo 2020 Dubai and Siemens have begun work on what is soon to become the first solar-powered hydrogen electrolysis facility in the Middle […] Read more
IMPORTANT: PRE-BID MEETING FOR 7500 MW GRID CONNECTED ULTRA MEGA SOLAR PV PROJECTS IN LEH AND KARGIL DISTRICTS, JAMMU AND KASHMIR Updated On Tue, Feb 5th, 2019 by Saurenergy This has reference to the RfS issued for 7500 MW Grid connected Ultra Mega Solar PV Projects in Leh and Kargil Districts, Jammu & Kashmir, vide RfS No. SECI/C&P/SPD/RFS/Leh-Kargil/7500MW/122018 dated 31.12.2018. The pre-bid meeting for the same has been hereby rescheduled as per the following details: Date: 18.02.2019 Timings: 11 AM-1 PM, followed by lunch […] Read more
The Indian Solar Standalone Product Market Projected to Reach Rs 26,178 Mn by 2023 Updated On Thu, Jan 31st, 2019 by Saurenergy The unveiling of a report, titled- ‘Peering into the future – India and the solar standalone products market’ by GOGLA, at the IDEF event, steer the discussions to the future of the distributed solar market in India, business opportunities, impact and innovations. GOGLA, together with International Finance Corporation, and Ashden India Collective, opened the conference […] Read more
Phase II of Pune Airport’s Solar Power Project to Begin Soon Updated On Mon, Jan 21st, 2019 by Saurenergy The second phase will see the installation of a 100 kWp capacity flexible panel solar power plant, making the airport the first in the country to have this facility. The Airport Authority of India (AAI) will soon begin work on the second phase of the solar power plant installation at Pune’s Lohegaon Airport. The second […] Read more
Uganda Gets Unique US$ 25 Million Solar Power Project Updated On Mon, Jan 14th, 2019 by Saurenergy This is the largest plant in the East African region. The latest addition of solar-generated energy to the national grid is the 24 MW Kabulasoke pilot solar power plant in Gomba District that was commissioned on 9th January, by President Museveni. UK based firm-Great Lakes Africa Energy (GLAE), Xsabo Group of Companies and Dr. David Alobo, a […] Read more
Sungrow and Solaria Energía Sign Deal for 400 MW Project Updated On Mon, Jan 7th, 2019 by Saurenergy Furthermore, Sungrow’s 1500V central inverter solution is an ideal match for Spain’s typical climate conditions. Sungrow, has supplied their 1500V inverters to Solaria, including a complete local medium voltage solution to a 400 MW solar PV installation. Solaria Energía y Medio Ambiente has already started the construction of the first parks located in Cáceres, Valladolid, […] Read more
SECI Issues RfS for 1200 MW Wind-Solar Hybrid Power Projects Updated On Wed, Jan 2nd, 2019 by Saurenergy The maximum tariff payable to each WPD is fixed at Rs 2.85/kWh for the entire term of 25 years. State-owned Solar Energy Corporation of India (SECI) has issued Request for Selection (RfS) document for setting up of 1200 MW ISTS connected wind power projects (Tranche-VI) on “Build Own Operate” basis. This 1200MW solar-wind hybrid tender […] Read more
NIT for Setting-Up 1.2GW ISTS Connected Solar PV Power Projects Updated On Wed, Jan 2nd, 2019 by Saurenergy The detailed Request for Selection (RfS) document will be available for downloading from January 14, 2019 onwards. The Solar Energy Corporation of India (SECI) has invited online bids for the setting up of 1200 MW ISTS connected solar PV power projects (ISTS-III). However, the detailed Request for Selection (RfS) document will be available for downloading from January […] Read more