NTPC to Purchase 1000 MW from Existing Solar and/or Wind Energy Producers Updated On Wed, Nov 28th, 2018 by Saurenergy The RfS document is available for download from November 27, 2018 to December 9, 2018 and the last date for submission of technical bid is December 20 2018. National Thermal Power Corporation (NTPC), India’s largest energy conglomerate, has recently invited bids from existing solar PV power plants and wind power plants for the reverse auction […] Read more
Radite Energy Bags 65 MW Project From Azure Power in Rajasthan Updated On Thu, Nov 22nd, 2018 by Saurenergy This is the fourth project which Radite Energy has bagged from Azure power. The previous projects were in Andhra Pradesh, Gujarat and Karnataka. Radite Energy, a complete turnkey solution provider for solar energy in India, has secured 65 MW project in Bhadla, Rajasthan from Azure Power. This is the fourth project which Radite Energy has […] Read more
Results of E-Bidding and E-RA for 1200 mw ISTS-Connected Wind Power Projects (Tranche-v) Updated On Sat, Oct 27th, 2018 by Saurenergy SOLAR ENERGY CORPORATION OF INDIA LIMITED Selection of 1200 MW ISTS-connected Wind Power Projects (Tranche-V) (RfS No: SECI/C&P/WPD/1200MW/T5/RfS/022018 dated 30.06.2018) After Technical Bid Opening After e-Reverse Auction (held on 25.09.2018) Sl. No. Bidder’s Name Capacity (MW) Bidder’s Name Bidder’s Quantity (MW) Tariff (INR/kWh) Awarded capacity (MW) 1 Alfanar Company 300 Torrent Power Limited 115 2.76 […] Read more
JA Solar Gets BIS Certification in India Updated On Thu, Oct 25th, 2018 by Saurenergy After a long test and strict audit, on its poly modules and mono PERC products, the company has recently received BIS certification. Shanghai-based high-performance solar power products maker JA Solar has received the certification for its photovoltaic (PV) modules from the Bureau of Indian Standards (BIS). After a long test and strict audit, on its […] Read more
Canadian Solar, Biosar to Build Total Eren’s 256 MW Solar Proj in Australia Updated On Mon, Oct 22nd, 2018 by Saurenergy Post completion, the project is expected to be the single largest solar power plant in Victoria, Australia, and will produce enough electricity to meet the needs of more than 133,500 Victorian homes and displacing more than 610,000 tonnes of carbon dioxide emissions annually. Solar PV modules maker Canadian Solar and solar EPC services provider Biosar Australia […] Read more
JSW Energy puts solar power plans on backburner over policy Updated On Mon, Oct 15th, 2018 by Saurenergy As uncertainties loom over the solar power sector, mainly on the policy front, the Sajjan Jindal-led JSW Energy has put its ambitious expansions plans in the segment on the backburner. The company in May had announced plans to set up a 1,000-MW solar photovoltaic (PV) panel manufacturing facility at Vijayanagar in Karnataka and to install […] Read more
Solar Plants Seek Clarity on GST Rate Updated On Mon, Sep 24th, 2018 by Saurenergy Solar plants industry seems to be divided with the developers and the manufacturers having distinct views on the advance ruling by the state advance ruling appellate. With Maharashtra and Karnataka’s Advance Ruling authority pegging GST rate for solar plants at 18 percent and 5 percent respectively, the solar industry seems to be in a jam […] Read more
IFGE Confers Green Energy Award on CleanMax Solar Updated On Mon, Sep 10th, 2018 by Saurenergy CleanMax Solar has won the award for its 145 MW solar farm at Sedam, Gulbarga District, Karnataka which supplies solar power to corporates like Adobe, ACC, United Breweries, SKF, Volvo and others. Achieving another milestone, sustainability partner for corporates, CleanMax Solar has won the ‘India Green Energy Award’ from country’s esteemed clean energy advisor Indian […] Read more
Karnataka Gov’t Exempts Rooftop Solar Power Stations below 1MW from Electrical Inspections Updated On Thu, Aug 30th, 2018 by Saurenergy The regular inspections by the state authorities are set under the Central Electricity Authority’s regulation ‘Measures Related to Safety and Electric Supply’. Karnataka Government has exempted rooftop solar power plants with production capacity below 1000 KW from the regular electrical inspections by the state’s electricity authority. However, solar rooftop generation units with capacity of above […] Read more