NTPC invites EPC tender for 6 Blocks of 125 MW Capacity Solar Power Project in Karnataka Updated On Fri, Mar 17th, 2017 by Saurenergy The 750 MW solar power tender will be awarded to multiple bidders in single/multiple blocks of 125 MW. India’s largest power utility firm, NTPC has invited EPC tender for the development of 750 MW (6 Blocks of 125 MW Capacity) Solar Power Project at Pavagada, Karnataka. The 750 MW capacity will be distributed into six […] Read more
SECI invites bid for 300MW solar projects with storage to be built in AP and Karnataka Updated On Sat, Jul 23rd, 2016 by Saurenergy Solar Energy Corp. of India (SECI) for the first time invited bids for 300 megawatts solar energy projects to be built in Andhra Pradesh and Karnataka. The project also includes storage as a requirement as part of a trial program aimed at making the renewable resource a more reliable source of power. In Andhra Pradesh […] Read more
SECI signs PPA with Five utilities in Karnataka for 1GW solar power project, issues NIT for 5MW project in Telangana Updated On Fri, Jul 1st, 2016 by Saurenergy Five utilities Karnataka have signed power purchase agreements (PPA) with Solar Energy Corporation of India (SECI) for 1GW of solar power project. According to recent reports Karnataka is facing one of the worst power crises in the last two decades. Solar Energy Corporation of India has also issued a notice of interest (NIT) for Design, […] Read more
Fortum bags 100 MW solar power park project in a reverse auction in Karnataka Updated On Wed, Apr 13th, 2016 by Saurenergy Finnish utility firm Fortum has announced that it won bid for 100 MW solar power park in the reverse auction. The reverse auction was conducted by NTPC on 12th April 2016 for the selection of 500 megawatt (MW) grid connected solar PV projects under Batch II Tranche I of JNNSM phase II. The solar power […] Read more
Inox Wind Wins 60 MW Order From Serentica For Karnataka Project Updated On Wed, Dec 18th, 2024 by Saurenergy Inox Wind Limited (IWL), a wind energy solutions provider, today announced bagging a 60 MW order from Serentica Renewables (Serentica), a commercial and Industrial (C&I) focused renewable energy company in India. This order is to supply 3 MW class turbines and will be delivered within H1 CY25. Additionally, IWL will provide multi-year post-commissioning Operations and […] Read more
Airport Solar Report card-12 Airports Switched To Solar In 2024, UP Leads Updated On Mon, Dec 9th, 2024 by Saurenergy The latest data shared by the Minister of State (MoS) in the Ministry of Civil Aviation (MoCA), Murlidhar Mohol in a written reply, said that about 80 airports have switched over to 100% green energy usage since 2014 in India. Besides trailblazer Kochy, it includes Bengaluru and Hubli Airport. Airports viz. Delhi, Mumbai, Hyderabad, and […] Read more
Can New Wind Energy Projects Transform Odisha’s RE Portfolio? Updated On Fri, Dec 6th, 2024 by Saurenergy Odisha, traditionally considered one of India’s less developed states in renewable energy, is now poised to emerge as a key player in wind energy. Despite currently having no wind energy capacity, the coastal state is attracting interest from wind energy companies, signaling a shift in its renewable energy landscape. At present, wind energy is concentrated […] Read more
60 GW Of PSP Projects Under Survey, Minister Tells Parliament Updated On Tue, Dec 3rd, 2024 by Saurenergy The latest update from the Ministry of New and Renewable Energy (MNRE) indicates that major pumped storage projects (PSPs) spread across nine states have a combined installed pumped storage potential of approximately 181.4 GW in the country. Parliamentary data shared by the Minister of State for New and Renewable Energy and Power, Shripad Yesso Naik, […] Read more
GAIL Issues Tender To Build Rooftop Solar Project In Bangalore Updated On Tue, Dec 3rd, 2024 by Saurenergy GAIL, a natural gas company, recently released a tender to design a solar-integrated rooftop system (SITC) and an on-grid rooftop solar project with a net-metering system in Bangalore. The bidder would undertake net metering for the project in the preceding seven years from the bid due date. The last date for bid submission is 16th […] Read more