Rooftop Solar Systems to Save NMRC Over Rs 4 Cr Annually Updated On Fri, Jun 21st, 2019 by Saurenergy NMRC is in the process of installing rooftop solar panels at its all its stations to offset its power consumption by generating solar power. The Noida Metro Rail Corporation (NMRC), which launched its 21-station network in January this year, is in the process of installing rooftop solar panels at its all its stations and depot […] Read more
HPGCL Floats Tender For 16 MW Solar Projects in Two Villages Updated On Thu, Jun 20th, 2019 by Saurenergy The Haryana Power Generation Corporation Ltd. (HPGCL) has issued a tender for the development of two solar power projects worth combined 16 MW in Haryana. The two solar projects worth a combined 16 MW will be developed as a 10 MW plant at the Dhandlan Village in Jhajjar, Haryana and a 6 MW solar plant […] Read more
Tariffs Drop to Rs 2.5/kWh in SECI’s 750 MW (Tranche-II) Solar Auction Updated On Thu, Jun 20th, 2019 by Saurenergy Four firms have emerged as the lowest bidders in the latest auction by SECI for the Rajasthan 750 MW solar Tender under Tranche-II. State-owned power giant NTPC, Mahindra Susten, Hero Solar Energy and Azure Power Maple have emerged as the lowest bidders in the latest auction by the Solar Energy Corporation of India (SECI) for the Rajasthan 750 MW solar […] Read more
NLC India Commissions 100 MW Solar Plant in Tamil Nadu Updated On Wed, Jun 19th, 2019 by Saurenergy NLC India Ltd. has announced in a regulatory filing that it has commissioned a 100 MW solar PV power plant in the state of Tamil Nadu. State-owned coal miner NLC India Ltd. has announced in a regulatory filing that it has commissioned a 100 MW solar PV power plant in the state of Tamil Nadu. […] Read more
BHEL Wins EPC Orders Worth 800 Cr For Setting Up 2 Solar Plants Updated On Mon, Jun 17th, 2019 by Saurenergy BHEL has won EPC contracts worth Rs 800 crore for setting up two solar PV power plants. Bharat Heavy Electricals Limited (BHEL), the country’s largest power equipment manufacturer, recently announced that it has won Engineering, Procurement and Construction (EPC) contracts worth Rs 800 crore for setting up two solar PV power plants. The two orders […] Read more
RfP For Consultants To Develop Floating Solar Plants in Arabian Gulf Updated On Thu, Jun 13th, 2019 by Saurenergy DEWA has issued an RfP for appointing consultants to study, develop and construct floating solar photovoltaic plants in the Arabian Gulf. The Dubai Electricity and Water Authority (DEWA) has issued a request for proposal (RfP) for appointing consultants to study, develop and construct floating solar photovoltaic plants in the Arabian Gulf. The RfP has been […] Read more
BHEL Wins Rs 530 crore Orders to Set up Solar Projects Updated On Mon, Jun 10th, 2019 by Saurenergy Bharat Heavy Electricals Limited (BHEL), the country’s largest power equipment manufacturer, today announced it has won three orders worth Rs 530 crore for setting up Solar Photovoltaic power plants on Engineering, Procurement and Construction (EPC) basis in Maharashtra and Gujarat. The orders are for a total of 135 Megawatt (MW) capacity have been placed by […] Read more
GIPCL Commissions 75 MW Solar Plant in Gujarat Updated On Fri, Jun 7th, 2019 by Saurenergy Gujarat Industries Power Company Ltd. (GIPCL) has announced the commissioning of a 75 MW solar PV power plant at Gujarat Solar Park in Patan, Gujarat. GIPCL had emerged as one of the successful bidders for the 75 MW solar power plant in the e-reverse auction conducted by the Gujarat Urja Vikas Nigam Ltd (GUVNL) in […] Read more
MNRE Roots for Robots To Reduce Water Usage at Solar Plants Updated On Thu, Jun 6th, 2019 by Saurenergy In an effort to reduce water usage in solar plants, the Ministry of New and Renewable Energy (MNRE) has asked the states and the solar industry to “preferably” use robotic cleaning and other new technologies for cleaning solar panels. “The excess usage of water, sometimes, leads to wastage of the precious resource and it can […] Read more