Rays Power Infra Signs 283 MWp Solar EPC Deal with Serentica Renewables Updated On Fri, Jul 28th, 2023 by Saurenergy Rays Power Infra, a solar EPC firm with a commissioned portfolio of 1.30 GWp, has signed an engineering, procurement, and construction (EPC) term sheet with Serentica Renewables, an end-to-end energy solutions firm focusing on industrial decarbonization. Based on the agreement between the two companies, Rays Power Infra shall be responsible for the engineering, procurement, and […] Read more
First Solar Secures 2.1 GW Order from Matrix for Advanced Thin Film Modules Updated On Fri, Jul 28th, 2023 by Saurenergy First Solar, Inc. and Matrix Renewables have announced a significant collaboration in the renewable energy sector. Matrix, the TPG Rise-backed global renewable energy platform, has entered into a framework agreement to procure approximately 2.1 gigawatts (GWDC) of advanced thin film modules from First Solar. These modules are scheduled to be delivered between 2024 and 2027, […] Read more
France’s Neoen Augments Queensland Battery Project to 270 MW/540 MWh Updated On Wed, Jul 26th, 2023 by Saurenergy France’s Independent Power Producer firm which develops, finances, builds and operates solar power plants, wind farms and energy storage solutions, Neoen will be augmenting the the size of its Western Downs Battery project located in Queensland. The expansion is to keep step with the growing demand for storage in the Australian state. Formerly, the battery […] Read more
BENY Emerges From the Shadows To Power 7 GW Solar Project with 1500V DC T& D Solution Updated On Wed, Jul 26th, 2023 by Saurenergy China-based BENY, which has been making big strides in the energy transition space with its power electronics has added a major feather in its cap with the stable performance of the world’s largest 7 GW solar PV power station in Qinghai Province’s upper reaches of the Yellow River. A prestigious project where China National Energy Investment […] Read more
Trina Solar Gets Zero Carbon Factory Certificate in PV Industry Updated On Tue, Jul 25th, 2023 by Saurenergy Trina Solar has announced the certification of its Yiwu manufacturing facility as a Zero Carbon Factory. This is the first factory in the PV industry to be awarded zero carbon status by an independent agency, claims the firm. Trina Solar’s Yiwu factory was assessed by TiGroup, a certification body specialising in health, safety, environmental and […] Read more
Design Engineer – SOLAR Updated On Tue, Jul 25th, 2023 by Saurenergy The person shall be able to carry out the design and detailed engineering for Solar Power plants like Mini Grid and Mega watt scales plants ,roof top plants . The Design Lead shall design and review the entire design documents and review drawings for a project or a set of smaller projects including co-ordination with […] Read more
Agri-Pv Fellowship Updated On Fri, Jul 21st, 2023 by Saurenergy Work in the intersection of Solar Energy and Agriculture Sectors Exposure to Technological as well as policy aspects of Agri-PV and potential evaluation Get insights and contribute to the advocacy of various Agri-PV projects and initiatives Get insights and contribute to studying the impact of Agri-PV on Solar as well as crop yield Opportunity for […] Read more
Trina Solar in 800 MW Module Supply Deal With Aquila Energy For EMEA Projects Updated On Thu, Jul 20th, 2023 by Saurenergy Trina Solar, a global top 6 integrated module maker, and Aquila Clean Energy EMEA, Aquila Group’s clean energy development platform in Europe, have signed a framework agreement for the supply of 800MW of photovoltaic modules for part of Aquila Clean Energy’s portfolio in Southern Europe. The agreement covers several projects which are part of the […] Read more
SECI Issues Tender for Soil Investigation for 13 GW Renewable Energy Project Sites in Leh Updated On Wed, Jul 19th, 2023 by Saurenergy Solar Energy Corporation of India (SECI) has issued a tender for the appointment of an agency to conduct soil investigation at proposed renewable energy project sites in Leh, Ladakh, with a cumulative capacity of 13 GW. The geotechnical analysis for the project must be completed within eight months of signing the contract. The last date […] Read more