Eastern and Southern Africa’s Vast Renewables Potential Offers Route to Sustainable Growth: IRENA Updated On Fri, Apr 16th, 2021 by Saurenergy Eastern and Southern Africa are vast, geographically diverse regions with rapidly growing populations and rising demands for energy. According to master plans for the two regional power pools, electricity demand is set to grow at between 3.4 and 5 percent per year to 2040. Meeting that demand is key to bolstering long-term growth in the […] Read more
Business Development Analyst II Updated On Fri, Apr 16th, 2021 by Saurenergy The First Solar Technology Sales & Origination team manages sales and relationships with buyers of First Solar PV module technology across customer groups of Developers, IPPs, Utilities, and EPCs. As the leading supplier of utility-scale solar projects in the U.S. market, First Solar is growing this fast-paced team to engage across the national utility-scale solar […] Read more
Global Grid Battery Storage Capacity will Likely Reach 134.6 GW by 2030: F&S Updated On Fri, Apr 16th, 2021 by Saurenergy As more nations commit to renewable energy, F&S predicts the global grid battery storage capacity to likely reach 134.6 GW by 2030. Frost & Sullivan’s (F&S) recent analysis on the global grid battery energy storage market finds that the continual expansion of intermittent renewables (RE) and declining technology costs are key factors fuelling the market. As more nations […] Read more
Senior Network Engineer Updated On Thu, Apr 15th, 2021 by Saurenergy The responsibilities include the design, installation and maintenance of the Integrity Management and Data Solutions Data Network globally. The individual must be qualified at all levels of LAN, WAN, Wireless and Security technologies. The candidate must be competent to work as a SME in the design, support, and troubleshooting of the Network Infrastructure. Knowledge of […] Read more
Design Engineer – Electrical (m/f/d) Updated On Thu, Apr 15th, 2021 by Saurenergy As a tax specialist, your tasks will include: Prepare in-house drawings and technical specifications for electrical works (BOM, BOQ, RFP) Design of all electrical systems for medium and large scale PV systems (DC, AC, LV, HV, communication systems/SCADA, earthing and lightening protection) Preparation of design packages for various project phases such as conceptualization, planning, tendering […] Read more
India’s First Li-ion Battery Plant in Karnataka Updated On Tue, Apr 13th, 2021 by Saurenergy Vikram Handa, son-in-law of steel tycoon Sajjan Jindal, set up Epsilon Advanced Materials Pvt in Karnataka in August last year to become the first manufacturer of lithium-ion battery parts in India. Handa’s investment in the plant will be a whopping Rs 60 billion ($807 million) so that 1 lakh tonnes of synthetic graphite anode can […] Read more
Power Ministry Yields; Proposes Net-Metering Limit of 500 kW Updated On Mon, Apr 12th, 2021 by Saurenergy After yielding to the representations received from the industry, the Power Ministry has proposed increasing the net-metering cap to 500 kW. The Ministry of Power had notified the Electricity (Rights of Consumers) Rules, 2020 on December 31, 2020, under section 176 of the Electricity Act, 2003. And since its release, the provision of net metering […] Read more
Electrical Engineer- LT/HT system installation and Photo Voltaic Updated On Thu, Apr 8th, 2021 by Saurenergy Responsibilities: Design including Technology Selection, System Configuration, Electrical Connection, Distribution and Control Systems, Power Conditioning Systems for Photo Voltaic power plant Responsible for complete project management through the installation, testing and commissioning of the system. Design, Erection, Commissioning and Maintenance of Photo Voltaic Power Plants Working with the company‘s engineers and program managers to ensure […] Read more
Poland Awards CfD to Baltica Offshore Wind Farms Worth 2.5 GW Updated On Thu, Apr 8th, 2021 by Saurenergy The Polish Energy Regulatory Office has awarded a CfD to the Baltica 3 & Baltica 2 offshore wind farms with a total capacity of up to 2.5 GW. The Polish Energy Regulatory Office has awarded a Contract for Difference (CfD) to the Baltica 3 and Baltica 2 offshore wind farms with a total capacity of […] Read more