JREDA Seeks Maintenance Partners For Rooftop Solar Projects On Govt Buildings Updated On Mon, Jun 24th, 2024 by Saurenergy The Jharkhand Renewable Energy Development Agency (JREDA) has issued a tender seeking Comprehensive Maintenance Contract (CMCO) partners for the rooftop solar projects installed onto the government buildings in the state. The state nodal agency has issued the tender seeking their services for five years on a rate contract basis. JREDA said that these bidders need […] Read more
SNEC Vibes-What Value Solar Module Warranties? Updated On Mon, Jun 24th, 2024 by Saurenergy At SNEC Shanghai, between the usual bustle and rush to see as much as possible, the one refrain that was obvious was the issue of shrinking margins for solar players. From the largest players like LONGi, JA solar and Jinko, to the smallest module players, many unknown in India, the common refrain was the issue […] Read more
MNRE To Verify DCR Claims Of Solar Modules, Launches Website Updated On Fri, Jun 21st, 2024 by Saurenergy In the wake of alleged fraudulent claims of Domestic Content Requirement (DCR) by a few solar module manufacturers, the Ministry of New and Renewable Energy (MNRE) has come up with a dedicated website to track and verify the DCR claims of Indian solar module manufacturers. DCR compliance is mandated in several government projects like the […] Read more
News Briefs June 21- Nextracker, Sembcorp, German Solar Target Updated On Fri, Jun 21st, 2024 by Saurenergy Nextracker Acquires Ojjio US solar tracker firm Nextracker has acquired Ojjo Inc., a leading foundations business in the solar power sector. This strategic move will allow Nextracker to providing comprehensive system solutions. According to Dan Shugar, Nextracker CEO, Optimization of the foundations and solar trackers enables customers to meet or exceed project-level LCOE targets while […] Read more
Top 5 Non-Chinese Solar Inverter Manufacturers Updated On Thu, Jun 20th, 2024 by Saurenergy A Solar inverter is one of the crucial components of solar panel systems, which converts the direct current (DC) generated by solar panels into alternating current (AC), which is suitable for powering household appliances, businesses, and the electrical grid. Needless to say, the solar inverter market growth is analogous to the growth of solar power […] Read more
MAHAGENCO Issues Tender Seeking EPC Contractors For Solar Project Updated On Thu, Jun 20th, 2024 by Saurenergy Maharashtra State Power Generation (MAHAGENCO) recently released a tender inviting bids under two systems, technical/commercial and price bid. The MAHAGENCO seeks bidders to select EPC contractors for the design, engineering, supply, erection, testing, and commissioning of 65 MWAC capacity crystalline solar PV technology. The project is located in a village in Lakhmapur, Taluka in Chandrapur […] Read more
Brookfield To Get IFC Funds For 550 MW Rajasthan Solar Park Updated On Wed, Jun 19th, 2024 by Saurenergy A portion of the funding required by Brookfield Asset Management to construct a 550-MWp solar park in the Indian state of Rajasthan would come from the International Finance Corporation (IFC). The Canadian organisation will be compensated USD 105 million (EUR 98 million) for long-term non-convertible debentures that are assigned to the special purpose vehicles of […] Read more
NTPC REL Invites Bids For 1000 MW Wind Energy Project In Karnataka Updated On Wed, Jun 19th, 2024 by Saurenergy NTPC Renewable Energy Limited (NTPC REL) has invited bids for the balance of the system package of an Inter-State Transmission System (ISTS)-connected wind energy project with a capacity of 1000 MW in Davangere Region in Karnataka under (Tranche-IV). The NTPC-REL tender was mandated the bidders to take up the responsibility of detailed design, engineering, micro-siting, […] Read more
Shift Engineer – Solar – Production Updated On Tue, Jun 18th, 2024 by Saurenergy Ensuring day wise production as per day wise plan of RBD,Stranding and Armouring. Identify and resolving atleast one safety issue in each areas of Wire Drawing,Stranding,Armouring in every month. Ensuring the Uptime(run time) of the section of Wire Drawing,Stranding and Armouring Section to be more than 80% i.e OR more than 80%. Position Summary:- Ensure […] Read more