Rajendra Parakh Takes Over As COO-EPC For Vikram Solar Updated On Mon, Mar 7th, 2022 by Saurenergy Vikram Solar, one of India’s leading module manufacturers and comprehensive EPC solar solutions provider, has announced the appointment of Rajendra Kumar Parakh as Chief Operating Officer (COO) for the Engineering, Procurement and Construction (EPC) division. Vikram Solar is among the leading EPC players as per installed EPC base in India, with experience of executing more […] Read more
Latest March ALMM List from MNRE for Solar PV Updated On Mon, Mar 7th, 2022 by Saurenergy The ministry of new and renewable energy has released its latest ALMM (Approved list of module manufacturers) list for domestic manufacturers in India, and the list continues to expand. The newest version, released through an office memorandum on March 4, has a total of 46 firms listed, comprising 43 unique firms in all. As Waaree […] Read more
Solar Cad Drafter Updated On Fri, Mar 4th, 2022 by Saurenergy This position is ideal for a recent graduate of an engineering technology diploma. The role of Solar CAD Drafter will involve processing data collected by site inspectors into optimized rooftop panel layouts (training on techniques/methods will be provided). The successful candidate should have high attention to detail, clear communication skills and be able to work in […] Read more
First Solar Q4 FY21 financial results: net sales jump 50% Updated On Thu, Mar 3rd, 2022 by Saurenergy US solar panel manufacturer First Solar has announced its financial results for the fourth quarter and year ended December 31, 2021, reporting net sales worth $0.9 billion for the fourth quarter, an increase of $0.3 billion from the prior quarter. This 50% increase was primarily a result of international project sales and increased module sales in […] Read more
Tirupati Temple, NTPC to sign MoU for solar projects Updated On Thu, Mar 3rd, 2022 by Saurenergy The world renowned Tirumala Tirupati Devasthanams (TTD) or ‘Tirupati Temple’ situated in Andhra Pradesh will sign a Memorandum of Understanding (MoU) with NTPC Vidyut Vyapar Nigam Limited (NVVN) to commission solar photovoltaic power projects. These projects are going to come up at Tirumala and Tirupati. The temple administration will purchase solar energy generated from these […] Read more
Systems Engineer, Solar and Storage – Requisition Engineering Updated On Wed, Mar 2nd, 2022 by Saurenergy Fluence is looking for a solar and storage systems engineer with experience designing, commissioning, and operating utility-scale solar and storage power plants. The role will be responsible for bridging both, product and field teams in supporting project commissioning, collecting and organizing feedback and driving product improvement implementation for solar and storage platforms. Responsibilities:- This role […] Read more
Autocad Drafter (Solar PV) Updated On Wed, Mar 2nd, 2022 by Saurenergy Compiling equipment data and specification sheets Preparing general arrangement drawings, plans, sections, elevations, details, schedules etc. Handle multiple revisions while ensuring engineering data and details accuracy Ability to switch between multiple projects quickly Maintain records of revisions and project level deliverables Qualifications And Experience:- Candidates having recent one year of hands-on AutoCAD experience to apply […] Read more
SJVN Bags 15 MW floating solar project in Himachal Updated On Sun, Feb 27th, 2022 by Saurenergy Nand Lal Sharma, Chairman & Managing Director, SJVN has announced the winning of a 15 MW Grid Connected Floating Solar PV Power Project at Nangal pond, near village Neilla, District Bilaspur, Himachal Pradesh. SJVN has bagged the full quoted capacity of 15 MW @ INR 3.26 /Unit on Build Own and Operate basis through e-Reverse […] Read more
Qatar’s First Solar Plant to Use 800 MW of LONGi’s Bifacial Modules Updated On Wed, Feb 23rd, 2022 by Saurenergy Located to the west of Doha over an area of 10 km2, the Al-Kharsaa project is the first solar power plant in Qatar, with a total planned power generation capacity of 800MW. The project will be equipped with Chinese manufacturer LONGi’s Hi-MO 4 bifacial modules and a tracking system. The company claims that this will […] Read more