AMEA Power Closes Financing of 1 GW Solar, Wind Project for US$1.1 Bn in Egypt Updated On Thu, Dec 1st, 2022 by Saurenergy AMEA Power, a Dubai-based developer, owner and operator of renewable generation assets, has closed the financing of 1 GW of renewable energy projects. The projects, which are to come up in Egypt, entail a 500 MW solar PV plant and a 500 MW wind farm. The US$1.1 billion investment for the project has been provided […] Read more
Application Engineer – Solar PV Updated On Thu, Dec 1st, 2022 by Saurenergy Responsibilities:- Review project inputs, drawings, and specifications; should be able to capture the scope and understand the complete requirements of the project. Review the geographical site location and understand the site details. Manage and organize meteorological data. Perform ‘Preliminary design’ in PVsyst for pre-sales activities. Perform ‘Project Design’ including thorough PV-system design and performance analysis. […] Read more
L&T Picks LONGi for Saudi Projects With 1292 MW Module Order Updated On Thu, Dec 1st, 2022 by Saurenergy L&T has picked Chinese major LONGi to provide 1292MW of PV modules for two solar projects under construction in Saudi Arabia. LONGi VP Dennis She and A. Ravindran, Senior Vice President and Head of the Renewables Strategic Business Group at L&T, jointly signed the agreement, involving two Saudi Arabian projects for which L&T is acting […] Read more
DLL Floats Tender for Supply of Solar Inverters for Solar Plant, Port Blair Updated On Wed, Nov 30th, 2022 by Saurenergy Directorate of Lighthouses and Lightships has floated a tender for the supply of solar inverters for the solar power plant at North Point Light House Port Blair. The last date for submitting the online bid is December 15, 2022, till 03:00 pm. Bids will be opened on December 16, 2022, at 03:00 pm. This solar […] Read more
World’s Largest Solar Thermal Project Starts Grid Supplies In Dubai Updated On Wed, Nov 30th, 2022 by Saurenergy On November 29 (Dubai Time), the Trough Unit No. 1 facility of Shanghai Electric’s 700MW solar thermal and 250MW photovoltaic solar power plant in Dubai has successfully achieved grid-connected electricity generation, marking a significant milestone along the path of the firm’s entry into the renewable energy sector. Solar Thermal Trough Unit No. 1 in Dubai Connected to […] Read more
WBSEDCL Floats Tender for 10 MW Ground-Mounted Solar Plant at Gangapur Updated On Tue, Nov 29th, 2022 by Saurenergy West Bengal State Electricity Distribution Company Limited (WBSEDCL) intends to develop two grid-connected & ground mounted solar PV power plants of 10 MW solar project (each) at Gangapur-I and Gangapur-II respectively under Rajnagar Block in Birbhum District of West Bengal. The last date for submitting the online bid is January 03, 2023, till 03:00 pm. […] Read more
Solar Is Changing Fast, Here Are 5 Ways It Already Has Updated On Mon, Nov 28th, 2022 by Saurenergy When the Jawaharlal Nehru National Solar Mission was launched back in January 2010, India had a total installed solar capacity of around 160 MW. The mission itself had a target of 20 GW by 2022. However, changes on the ground in terms of technology, availability and fresh climate realities meant a wholesale upgrade on those […] Read more
SJVN Begins Operating 75 MW Parasan Solar Project in Uttar Pradesh Updated On Fri, Nov 25th, 2022 by Saurenergy The state-run company, SJVN Ltd.’s 75 MW Parasan Solar Power Project, Uttar Pradesh, has achieved commercial operation, according to Nand Lal Sharma, Chairman & Managing Director. The installed capacity of SJVN is now 2091.5 MW. To build a 75 MW solar power project at the Parasan Solar Park in Uttar Pradesh, state-owned SJVN signed a […] Read more
NTPC Floats 1200 MW of BoS Tender for Solar Project in Kutch, Gujarat Updated On Fri, Nov 25th, 2022 by Saurenergy National Thermal Power Corporation Limited (NTPC) Renewables has floated a balance of system (BOS) tender package for a 1200 MW (4 X 300 MW) solar project at Khavda RE power park, Rann of Kutch, Gujarat. The last date for submitting the bid of this NTPC BOS tender is January 09, 2023, till 03:00 pm and […] Read more