TCIL Invites Bids for Selecting Partner to Install 2 MW Floating Solar in Mauritius Updated On Mon, Dec 5th, 2022 by Saurenergy To find a partner for the design, provision, installation, testing, and commissioning of a 2 MW floating solar power plant at Tamarind Falls Reservoir in Mauritius, government-owned Telecommunications Consultants India Limited (TCIL) has released an expression of interest (EoI). The deadline for submitting proposals is December 21, 2022. On the same day, bids will be […] Read more
NREL Confirms Spike In Solar and Storage Costs In US Updated On Fri, Dec 2nd, 2022 by Saurenergy The National Renewable Energy Laboratory (NREL), the premier government entity tasked with tracking and projecting impact of technology changes in the renewables space, has come out with its annual benchmarking report on prices. And the findings are no surprise, to those who have been in the market. Using 2021 prices, NREL estimates that utility-scale PV […] Read more
AMEA Power Closes Financing of 1 GW Solar, Wind Project for US$1.1 Bn in Egypt Updated On Thu, Dec 1st, 2022 by Saurenergy AMEA Power, a Dubai-based developer, owner and operator of renewable generation assets, has closed the financing of 1 GW of renewable energy projects. The projects, which are to come up in Egypt, entail a 500 MW solar PV plant and a 500 MW wind farm. The US$1.1 billion investment for the project has been provided […] Read more
Application Engineer – Solar PV Updated On Thu, Dec 1st, 2022 by Saurenergy Responsibilities:- Review project inputs, drawings, and specifications; should be able to capture the scope and understand the complete requirements of the project. Review the geographical site location and understand the site details. Manage and organize meteorological data. Perform ‘Preliminary design’ in PVsyst for pre-sales activities. Perform ‘Project Design’ including thorough PV-system design and performance analysis. […] Read more
L&T Picks LONGi for Saudi Projects With 1292 MW Module Order Updated On Thu, Dec 1st, 2022 by Saurenergy L&T has picked Chinese major LONGi to provide 1292MW of PV modules for two solar projects under construction in Saudi Arabia. LONGi VP Dennis She and A. Ravindran, Senior Vice President and Head of the Renewables Strategic Business Group at L&T, jointly signed the agreement, involving two Saudi Arabian projects for which L&T is acting […] Read more
DLL Floats Tender for Supply of Solar Inverters for Solar Plant, Port Blair Updated On Wed, Nov 30th, 2022 by Saurenergy Directorate of Lighthouses and Lightships has floated a tender for the supply of solar inverters for the solar power plant at North Point Light House Port Blair. The last date for submitting the online bid is December 15, 2022, till 03:00 pm. Bids will be opened on December 16, 2022, at 03:00 pm. This solar […] Read more
World’s Largest Solar Thermal Project Starts Grid Supplies In Dubai Updated On Wed, Nov 30th, 2022 by Saurenergy On November 29 (Dubai Time), the Trough Unit No. 1 facility of Shanghai Electric’s 700MW solar thermal and 250MW photovoltaic solar power plant in Dubai has successfully achieved grid-connected electricity generation, marking a significant milestone along the path of the firm’s entry into the renewable energy sector. Solar Thermal Trough Unit No. 1 in Dubai Connected to […] Read more
WBSEDCL Floats Tender for 10 MW Ground-Mounted Solar Plant at Gangapur Updated On Tue, Nov 29th, 2022 by Saurenergy West Bengal State Electricity Distribution Company Limited (WBSEDCL) intends to develop two grid-connected & ground mounted solar PV power plants of 10 MW solar project (each) at Gangapur-I and Gangapur-II respectively under Rajnagar Block in Birbhum District of West Bengal. The last date for submitting the online bid is January 03, 2023, till 03:00 pm. […] Read more
Solar Is Changing Fast, Here Are 5 Ways It Already Has Updated On Mon, Nov 28th, 2022 by Saurenergy When the Jawaharlal Nehru National Solar Mission was launched back in January 2010, India had a total installed solar capacity of around 160 MW. The mission itself had a target of 20 GW by 2022. However, changes on the ground in terms of technology, availability and fresh climate realities meant a wholesale upgrade on those […] Read more