SUBSCRIBE NEWS LETTER

Solar PV Power Plant Projects

UPNEDA Invites Bids for Empanelment for 38 MW Rooftop Solar Plants

The Uttar Pradesh New & Renewable Development Agency (UPNEDA) has invited e-bids from eligible vendors interested in being empanelled for the design, supply, erection, testing and commissioning, including warranty and comprehensive operation & maintenance, of 38 MW of grid-connected rooftop solar plants for residential consumers under CAPEX model for a period of five years in Uttar Pradesh. […]

Read more

ISRO Can Spot Ideal Locations for Installing Solar Projects

Indian space agency can suggest the ideal location to put up a solar power farm with the data gathered from its geostationary earth observation satellites within and outside India, said a top official at the Indian Space Research Organisation (ISRO). He also said the technology can be transferred to those who are interested. “We have demonstrated […]

Read more

Senior Solar Engineer – Energy

Burns & McDonnell India (BMI) Energy Division is looking for a well-rounded and driven solar PV design engineer in the Mumbai Office to assist with conceptual design of solar developments and to perform the detailed design of solar projects. The conceptual design will involve collecting preliminary site information, performing site layouts, and iterating different technology […]

Read more

Assistant Manager – PV Performance Engineering

The Assistant Manager – PV Performance Engineering will be based in Hyderabad, India.  Onboarding will be virtual for the time being with occasional socially distanced meetings at a Nextracker office. In this position, you will report to the Senior Manager – Data Science. The Assistant Manager – PV Performance Engineering will work with the Nextracker […]

Read more

Nextracker First To Reach 50 GW Solar Tracker Shipments Globally

Nextracker™ has announced the crossing of the 50 gigawatts (GW) in global shipments for it. The achievement makes it the first solar tracker firm to get there, and marks the relevance of a technology that is on the ascendance once more, as more efficient modules hit the market. The 50 GW figure is equivalent to […]

Read more

Tata Pwr, Tata Steel to Set Up 41MW Solar Plants in Jharkhand & Odisha

Tata Power and Tata Steel, the two flagship companies of the Tata Group, have come together to develop grid-connected solar plants in Jharkhand and Odisha. The two companies have signed a Power Purchase Agreement (PPA) for a duration of 25 years to set up 41MW solar project, which will be a combination of rooftop, floating […]

Read more

56% Solar Projects Planned for 2022 at Risk due to Mfg Cost Hike: Rystad

The earliest estimates on the impact of price volatility and rising costs on solar projects worldwide are finally coming out, and the news is not good. The surging cost of manufacturing materials and shipping could threaten 50 gigawatts (GW) – a staggering 56% – of the 90 GW of global utility PV developments planned for […]

Read more

525 KW Solar Plant Installed in Golden Temple, Punjab

With the financial assistance of the US-based United Sikh Mission, a 525 KW capacity solar power plant was commissioned in the holiest of Sikh shrines, Harmandir Sahib, popularly known as Golden Temple, in Amritsar, Punjab, on Tuesday. “Our mission is to ensure clean power supply round the clock at Sri Darbar Sahib, saving 33 per […]

Read more

Senior PV Performance Analyst

The Senior PV Performance Analyst will be based in Hyderabad, India.  Onboarding will be virtual for the time being with occasional socially distanced meetings at a Nextracker office. You will use various PV performance analysis and modeling methods prevalent in the industry for understanding Nextracker’s smart control system’s behavior. You will also explore and develop […]

Read more
      SUBSCRIBE NEWS LETTER
Scroll